Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge construction supporting device
The invention relates to a bridge construction supporting device which comprises a base, a supporting column, a supporting rod, a first supporting plate, a second supporting plate, a supporting ring and a central control processor. The central control processor is used for detecting the actual situation during construction in real time, and the supporting pressure standards of the first supportingplate and the second supporting plate are set according to the actual situation; in the construction process, when the pressure borne by the first supporting plate or the second supporting plate is larger than the preset supporting pressure standard, the supporting ring is controlled to be arranged on the outer wall of the first supporting plate and the outer wall of the second supporting plate in a sleeving mode so as to conduct secondary supporting on the bridge supporting column. The supporting ring is used for secondarily supporting the bridge supporting column, the situation that the supporting structure deforms due to the fact that the first supporting plate and the second supporting plate bear too high pressure can be effectively prevented, and therefore the supporting efficiency of the supporting device is effectively improved.
本发明涉及一种桥梁施工支护装置,包括:底座、支柱、支撑杆、第一支护板、第二支护板、支护环和中控处理器。本发明通过使用中控处理器实时检测施工时的实际情况并根据实际情况设置所述第一支护板和第二支护板的支护压力标准,在施工过程中第一支护板或第二支护板承受压力大于预设支护压力标准时控制支护环套设在第一支护板和第二支护板外壁以对桥梁支柱进行二次支护,通过使用支护环对桥梁支柱的二次支护,能够有效防止第一支护板和第二支护板承受压力过高导致支护结构出现形变的情况发生,从而有效提高了本发明所述支护装置的支护效率。
Bridge construction supporting device
The invention relates to a bridge construction supporting device which comprises a base, a supporting column, a supporting rod, a first supporting plate, a second supporting plate, a supporting ring and a central control processor. The central control processor is used for detecting the actual situation during construction in real time, and the supporting pressure standards of the first supportingplate and the second supporting plate are set according to the actual situation; in the construction process, when the pressure borne by the first supporting plate or the second supporting plate is larger than the preset supporting pressure standard, the supporting ring is controlled to be arranged on the outer wall of the first supporting plate and the outer wall of the second supporting plate in a sleeving mode so as to conduct secondary supporting on the bridge supporting column. The supporting ring is used for secondarily supporting the bridge supporting column, the situation that the supporting structure deforms due to the fact that the first supporting plate and the second supporting plate bear too high pressure can be effectively prevented, and therefore the supporting efficiency of the supporting device is effectively improved.
本发明涉及一种桥梁施工支护装置,包括:底座、支柱、支撑杆、第一支护板、第二支护板、支护环和中控处理器。本发明通过使用中控处理器实时检测施工时的实际情况并根据实际情况设置所述第一支护板和第二支护板的支护压力标准,在施工过程中第一支护板或第二支护板承受压力大于预设支护压力标准时控制支护环套设在第一支护板和第二支护板外壁以对桥梁支柱进行二次支护,通过使用支护环对桥梁支柱的二次支护,能够有效防止第一支护板和第二支护板承受压力过高导致支护结构出现形变的情况发生,从而有效提高了本发明所述支护装置的支护效率。
Bridge construction supporting device
桥梁施工支护装置
JIANG SHANGUO (Autor:in) / ZHANG XINSHE (Autor:in) / GENG JUNQING (Autor:in) / DUAN ZHENYU (Autor:in) / HUANG RONG (Autor:in)
02.04.2021
Patent
Elektronische Ressource
Chinesisch