Roller compacted concrete damming gallery-crossing rapid construction structure and construction method thereof
The invention discloses a roller compacted concrete damming gallery-crossing rapid construction structure which comprises a steel trestle, concrete precast blocks A and concrete precast blocks B. The concrete precast blocks A are placed on the two sides of a gallery, protruding blocks are arranged at the two ends of the sides, close to the gallery, of the concrete precast blocks A, and the side faces of the protruding blocks are tightly attached to the outer wall of the gallery. The concrete precast blocks B are placed on sides of the out-bin concrete precast blocks A. The steel trestle is placed on the upper portions of the concrete precast blocks A and the upper portions of the concrete precast blocks B. The steel trestle stretches across the gallery from one side of the gallery to the other side of the gallery. By using the concrete precast blocks A, the concrete precast blocks B and the steel trestle, roller compacted concrete damming cross-gallery rapid construction can be achieved, the steel trestle can be flexibly lifted according to the pouring height, the limitation of topographic conditions is avoided, mounting and dismounting operation is convenient, the construction cost is saved, and the construction period is shortened.
本发明公开了一种碾压混凝土筑坝跨廊道快速施工构造及其施工方法,包括钢栈桥、混凝土预制块A、混凝土预制块B,所述混凝土预制块A放置在廊道两侧,混凝土预制块A靠近廊道一侧的两端设有凸块,且凸块侧面紧贴在廊道外壁上,所述混凝土预制块B放置在仓外混凝土预制块A一侧,钢栈桥放置在混凝土预制块A和混凝土预制块B上部,且钢栈桥从廊道一侧横跨到廊道另一侧。本发明通过使用混凝土预制块A、混凝土预制块B、钢栈桥,可实现碾压混凝土筑坝跨廊道快速施工,且可以灵活的根据浇筑高度抬高钢栈桥,不受地形条件制约,安装及拆卸操作方便,节约施工成本并缩短工期。
Roller compacted concrete damming gallery-crossing rapid construction structure and construction method thereof
The invention discloses a roller compacted concrete damming gallery-crossing rapid construction structure which comprises a steel trestle, concrete precast blocks A and concrete precast blocks B. The concrete precast blocks A are placed on the two sides of a gallery, protruding blocks are arranged at the two ends of the sides, close to the gallery, of the concrete precast blocks A, and the side faces of the protruding blocks are tightly attached to the outer wall of the gallery. The concrete precast blocks B are placed on sides of the out-bin concrete precast blocks A. The steel trestle is placed on the upper portions of the concrete precast blocks A and the upper portions of the concrete precast blocks B. The steel trestle stretches across the gallery from one side of the gallery to the other side of the gallery. By using the concrete precast blocks A, the concrete precast blocks B and the steel trestle, roller compacted concrete damming cross-gallery rapid construction can be achieved, the steel trestle can be flexibly lifted according to the pouring height, the limitation of topographic conditions is avoided, mounting and dismounting operation is convenient, the construction cost is saved, and the construction period is shortened.
本发明公开了一种碾压混凝土筑坝跨廊道快速施工构造及其施工方法,包括钢栈桥、混凝土预制块A、混凝土预制块B,所述混凝土预制块A放置在廊道两侧,混凝土预制块A靠近廊道一侧的两端设有凸块,且凸块侧面紧贴在廊道外壁上,所述混凝土预制块B放置在仓外混凝土预制块A一侧,钢栈桥放置在混凝土预制块A和混凝土预制块B上部,且钢栈桥从廊道一侧横跨到廊道另一侧。本发明通过使用混凝土预制块A、混凝土预制块B、钢栈桥,可实现碾压混凝土筑坝跨廊道快速施工,且可以灵活的根据浇筑高度抬高钢栈桥,不受地形条件制约,安装及拆卸操作方便,节约施工成本并缩短工期。
Roller compacted concrete damming gallery-crossing rapid construction structure and construction method thereof
一种碾压混凝土筑坝跨廊道快速施工构造及其施工方法
XIANG QIAN (Autor:in) / ZHANG YING (Autor:in) / XIONG TAO (Autor:in) / PAN WEI (Autor:in)
06.04.2021
Patent
Elektronische Ressource
Chinesisch
Intelligent roller compacted concrete equipment and construction method thereof
Europäisches Patentamt | 2024
|Roller compacted concrete dam seepage-proofing structure and construction method thereof
Europäisches Patentamt | 2020
|Roller-compacted concrete pavements and concrete construction
UB Braunschweig | 1986
|Dam roller compacted concrete rollover construction method
Europäisches Patentamt | 2023
|