Pipe gallery construction process
The invention relates to the field of building construction, and particularly relates to a pipe gallery construction process. The pipe gallery construction process comprises the following process steps of S1, surveying and setting out; S2, groove excavation; S3, cushion layer construction and bottom plate waterproof construction, specifically, S31, concrete cushion layer pouring; S32, base waterproof treatment; S4, pipe gallery steel bar and concrete pouring; S5, formwork engineering; S6, concrete pouring, specifically, S61, layered pouring; S62, concrete pouring; S63, concrete curing; S7, deformation joint and construction joint treatment; S8, wall body and top plate waterproof treatment; and S9, groove backfilling. According to the pipe gallery construction process, through a concrete cushion layer, a cement mortar leveling layer, a waterproof coiled material and a waterproof coiled material, base waterproof treatment is achieved, the influence of underground water seepage on pipe gallery construction is reduced, the waterproof performance of a base is enhanced, subsequent construction of a pipe gallery is facilitated, and the overall efficiency of pipe gallery construction is improved; and meanwhile, through a concrete pouring process, holes in the concrete pouring process are reduced, and the overall strength of the pipe gallery is improved.
本申请涉及建筑施工领域,尤其涉及一种管廊施工工艺,其工艺步骤如下:S1、测量放线;S2、沟槽开挖;S3、垫层施工及底板防水施工:S31、浇筑混凝土垫层;S32、基底防水处理;S4、管廊钢筋及砼浇筑;S5、模板工程;S6、混凝土浇筑:S61、分层浇筑;S62、混凝土浇筑;S63、混凝土养护;S7、变形缝及施工缝处理;S8、墙身及顶板防水处理;S9、沟槽回填。本申请编制的管廊施工工艺,通过混凝土垫层、水泥砂浆找平层、防水卷材以及防水卷材,实现了基底防水处理,减小了地下水渗出对管廊施工的影响,增强了基底的防水性能,便于管廊的后续施工,提高管廊施工的整体效率,同时,通过混凝土浇筑工艺,减少了混凝土浇筑过程中的孔洞,提高了管廊的整体强度。
Pipe gallery construction process
The invention relates to the field of building construction, and particularly relates to a pipe gallery construction process. The pipe gallery construction process comprises the following process steps of S1, surveying and setting out; S2, groove excavation; S3, cushion layer construction and bottom plate waterproof construction, specifically, S31, concrete cushion layer pouring; S32, base waterproof treatment; S4, pipe gallery steel bar and concrete pouring; S5, formwork engineering; S6, concrete pouring, specifically, S61, layered pouring; S62, concrete pouring; S63, concrete curing; S7, deformation joint and construction joint treatment; S8, wall body and top plate waterproof treatment; and S9, groove backfilling. According to the pipe gallery construction process, through a concrete cushion layer, a cement mortar leveling layer, a waterproof coiled material and a waterproof coiled material, base waterproof treatment is achieved, the influence of underground water seepage on pipe gallery construction is reduced, the waterproof performance of a base is enhanced, subsequent construction of a pipe gallery is facilitated, and the overall efficiency of pipe gallery construction is improved; and meanwhile, through a concrete pouring process, holes in the concrete pouring process are reduced, and the overall strength of the pipe gallery is improved.
本申请涉及建筑施工领域,尤其涉及一种管廊施工工艺,其工艺步骤如下:S1、测量放线;S2、沟槽开挖;S3、垫层施工及底板防水施工:S31、浇筑混凝土垫层;S32、基底防水处理;S4、管廊钢筋及砼浇筑;S5、模板工程;S6、混凝土浇筑:S61、分层浇筑;S62、混凝土浇筑;S63、混凝土养护;S7、变形缝及施工缝处理;S8、墙身及顶板防水处理;S9、沟槽回填。本申请编制的管廊施工工艺,通过混凝土垫层、水泥砂浆找平层、防水卷材以及防水卷材,实现了基底防水处理,减小了地下水渗出对管廊施工的影响,增强了基底的防水性能,便于管廊的后续施工,提高管廊施工的整体效率,同时,通过混凝土浇筑工艺,减少了混凝土浇筑过程中的孔洞,提高了管廊的整体强度。
Pipe gallery construction process
一种管廊施工工艺
HE YING (Autor:in) / LI HONGWEN (Autor:in) / LIU PANPAN (Autor:in) / ZHANG JIANJUN (Autor:in) / ZUO XU (Autor:in) / LI BO (Autor:in) / LI WEIPENG (Autor:in) / WANG LONG (Autor:in) / ZHANG ERPENG (Autor:in) / LI ZHIDONG (Autor:in)
13.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2016
|Europäisches Patentamt | 2022
|Construction method of comprehensive pipe gallery and long-section pipe gallery
Europäisches Patentamt | 2022
|