Aerial work platform of power transmission line tower cross arm
The embodiment of the invention relates to an aerial work platform of a power transmission line tower cross arm. The platform comprises a platform frame and an anti-skid insulating plate, the platform frame comprises at least two cross arm hanging point pieces, a connecting piece, a connecting seat, a first support plate and a second support plate, and a suspension connecting piece is arranged on the connecting seat. The platform frame and the suspension connecting piece of the aerial work platform of the power transmission line tower cross arm are connected with the tower cross arm of the power transmission line to fix the aerial work platform of the power transmission line tower cross arm on the tower of the power transmission line. High-altitude operators mainly stand on the antiskid insulating plate of the aerial work platform of the power transmission line tower cross arm, aerial work can be carried out, a safe and reliable operation platform is provided for the high-altitude operators, physical exhaustion of the operators on the tower is reduced, the operation difficulty is reduced, the operation efficiency is improved, personal safety risks and power grid safety risks are reduced, and the problems of high physical output, high operation difficulty and low operation efficiency of operators working aloft in the prior art are solved.
本发明实施例涉及一种输电线路杆塔横担的高空作业平台,包括平台架和防滑绝缘板,平台架包括至少两个横担挂点件、连接件、连接座、第一支撑板和第二支撑板,连接座上设置有悬挂连接件。该输电线路杆塔横担的高空作业平台的平台架和悬挂连接件与输电线路的杆塔横担连接将该输电线路杆塔横担的高空作业平台固定在输电线路的杆塔上,高空的作业人员主要站立在该输电线路杆塔横担的高空作业平台的防滑绝缘板可以进行高空作业,为高空作业人员提供了安全可靠的作业平台,降低了杆塔上作业人员体力消耗,降低了作业难度,提升了作业效率,降低了人身安全风险和电网安全风险,也解决了现有高空作业的作业人员体力消耗大、作业难度大、作业效率低的问题。
Aerial work platform of power transmission line tower cross arm
The embodiment of the invention relates to an aerial work platform of a power transmission line tower cross arm. The platform comprises a platform frame and an anti-skid insulating plate, the platform frame comprises at least two cross arm hanging point pieces, a connecting piece, a connecting seat, a first support plate and a second support plate, and a suspension connecting piece is arranged on the connecting seat. The platform frame and the suspension connecting piece of the aerial work platform of the power transmission line tower cross arm are connected with the tower cross arm of the power transmission line to fix the aerial work platform of the power transmission line tower cross arm on the tower of the power transmission line. High-altitude operators mainly stand on the antiskid insulating plate of the aerial work platform of the power transmission line tower cross arm, aerial work can be carried out, a safe and reliable operation platform is provided for the high-altitude operators, physical exhaustion of the operators on the tower is reduced, the operation difficulty is reduced, the operation efficiency is improved, personal safety risks and power grid safety risks are reduced, and the problems of high physical output, high operation difficulty and low operation efficiency of operators working aloft in the prior art are solved.
本发明实施例涉及一种输电线路杆塔横担的高空作业平台,包括平台架和防滑绝缘板,平台架包括至少两个横担挂点件、连接件、连接座、第一支撑板和第二支撑板,连接座上设置有悬挂连接件。该输电线路杆塔横担的高空作业平台的平台架和悬挂连接件与输电线路的杆塔横担连接将该输电线路杆塔横担的高空作业平台固定在输电线路的杆塔上,高空的作业人员主要站立在该输电线路杆塔横担的高空作业平台的防滑绝缘板可以进行高空作业,为高空作业人员提供了安全可靠的作业平台,降低了杆塔上作业人员体力消耗,降低了作业难度,提升了作业效率,降低了人身安全风险和电网安全风险,也解决了现有高空作业的作业人员体力消耗大、作业难度大、作业效率低的问题。
Aerial work platform of power transmission line tower cross arm
一种输电线路杆塔横担的高空作业平台
ZHANG CHUNYONG (Autor:in) / YE JIANHUI (Autor:in) / WU DA (Autor:in) / RONG ZHISONG (Autor:in) / RAN QIAN (Autor:in) / LIU HANZHANG (Autor:in) / ZHANG XIAOQING (Autor:in) / GAN YONGYE (Autor:in) / DENG MAOCUN (Autor:in) / ZHU CHANGZHEN (Autor:in)
23.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Expansion device for aerial work platform of overhead transmission line iron tower