Expansion device for aerial work platform of overhead transmission line iron tower
The invention provides an overhead transmission line iron tower aerial work platform extension device which is used in cooperation with an iron tower and relates to the field of maintenance equipment, the overhead transmission line iron tower aerial work platform extension device comprises a plurality of connecting rods, two folding frames and a flexible laying panel, the connecting rods are connected to the two folding frames at the same time, and each folding frame has an unfolded state and a folded state which are switched mutually; the flexible laying panel is arranged on the connecting rods in a winding mode, and the flexible laying panel is used for being laid on the multiple connecting rods when the two folding frames are both in the unfolded state. The safety of an operator working in a high-altitude environment can be improved, and the working efficiency of the operator can also be improved.
本申请提供一种架空输电线路铁塔高空作业平台扩展装置,用于与铁塔配合使用,涉及检修设备领域,包括多根连接杆、两个折叠架和柔性铺设面板,多根连接杆均同时连接于两个折叠架,每个折叠架均具有相互切换的展开状态和折叠状态;柔性铺设面板绕设于连接杆上,柔性铺设面板用于在两个折叠架均处于展开状态时铺设于多根连接杆上。其能够提高在高空环境下作业的作业人员的安全性,并且还能提高作业人员的作业效率。
Expansion device for aerial work platform of overhead transmission line iron tower
The invention provides an overhead transmission line iron tower aerial work platform extension device which is used in cooperation with an iron tower and relates to the field of maintenance equipment, the overhead transmission line iron tower aerial work platform extension device comprises a plurality of connecting rods, two folding frames and a flexible laying panel, the connecting rods are connected to the two folding frames at the same time, and each folding frame has an unfolded state and a folded state which are switched mutually; the flexible laying panel is arranged on the connecting rods in a winding mode, and the flexible laying panel is used for being laid on the multiple connecting rods when the two folding frames are both in the unfolded state. The safety of an operator working in a high-altitude environment can be improved, and the working efficiency of the operator can also be improved.
本申请提供一种架空输电线路铁塔高空作业平台扩展装置,用于与铁塔配合使用,涉及检修设备领域,包括多根连接杆、两个折叠架和柔性铺设面板,多根连接杆均同时连接于两个折叠架,每个折叠架均具有相互切换的展开状态和折叠状态;柔性铺设面板绕设于连接杆上,柔性铺设面板用于在两个折叠架均处于展开状态时铺设于多根连接杆上。其能够提高在高空环境下作业的作业人员的安全性,并且还能提高作业人员的作业效率。
Expansion device for aerial work platform of overhead transmission line iron tower
架空输电线路铁塔高空作业平台扩展装置
OUYANG WEIPIN (Autor:in) / ZHANG YAN (Autor:in) / YANG JUMEI (Autor:in) / ZHU DAN (Autor:in) / WAN MINGQIAN (Autor:in) / HU GUANGYA (Autor:in) / CHEN YUEZHONG (Autor:in)
26.12.2023
Patent
Elektronische Ressource
Chinesisch
Aerial work platform of power transmission line tower cross arm
Europäisches Patentamt | 2021
|Emergency repair tower base for overhead transmission line
Europäisches Patentamt | 2015
|Branching tower for four-loop overhead transmission line
Europäisches Patentamt | 2020
|