Scenic spot large-pedestrian-flow construction method
The invention provides a scenic spot large-pedestrian-flow construction method which comprises the following steps that S1, lofting and positioning are conducted, specifically, a constructor locates and marks out the position where a pipeline needs to be arranged; S2, grooving preparation is conducted, specifically, the stone plates on the two sides of the lofting position are opened, and concrete below the stone plates is broken; S3, groove digging is conducted, earthwork operation is started on the two sides of the lofting position, and pit grooves facilitating construction are dug out; S4, water drill transverse punching is conducted, specifically, a constructor oppositely starts water drill punching operation on the two sides in the lofting direction till the constructor and the water drill are communicated; S5, transverse pipe distribution is conducted, specifically, the plastic pipe is inserted into a hole drilled by a rhinestone and fixed to serve as a transverse pipe; S6, longitudinal pipe distribution is conducted, specifically, the plastic pipes and the transversely-arranged plastic pipes are connected through elbows and fixed to serve as longitudinal pipes; S7, and operation is recovered; the method has the characteristics of short construction operation time, small influence and low cost.
本发明提供一种景区人流量大处施工方法,其包括以下步骤:S1:放样定位,施工人员将需要设置管路的位置放样标出;S2:挖槽准备,掀开放样位置两侧的石板、破除石板下的混凝土;S3:挖槽,在放样位置的两侧开始土方作业,挖出便于施工的坑槽;S4:水钻横向打孔,施工人员在两侧分别沿着放样方向相对开始水钻打孔作业,直至双方连通;S5:横向布管,将塑管插装到水钻打出的孔洞内,并进行固定,作为横向管;S6:纵向布管,利用弯头将塑管和横向布置的塑管进行连接,并进行固定,作为纵向管;S7:恢复作业;本发明具有施工作业时间短、影响小、成本低的特点。
Scenic spot large-pedestrian-flow construction method
The invention provides a scenic spot large-pedestrian-flow construction method which comprises the following steps that S1, lofting and positioning are conducted, specifically, a constructor locates and marks out the position where a pipeline needs to be arranged; S2, grooving preparation is conducted, specifically, the stone plates on the two sides of the lofting position are opened, and concrete below the stone plates is broken; S3, groove digging is conducted, earthwork operation is started on the two sides of the lofting position, and pit grooves facilitating construction are dug out; S4, water drill transverse punching is conducted, specifically, a constructor oppositely starts water drill punching operation on the two sides in the lofting direction till the constructor and the water drill are communicated; S5, transverse pipe distribution is conducted, specifically, the plastic pipe is inserted into a hole drilled by a rhinestone and fixed to serve as a transverse pipe; S6, longitudinal pipe distribution is conducted, specifically, the plastic pipes and the transversely-arranged plastic pipes are connected through elbows and fixed to serve as longitudinal pipes; S7, and operation is recovered; the method has the characteristics of short construction operation time, small influence and low cost.
本发明提供一种景区人流量大处施工方法,其包括以下步骤:S1:放样定位,施工人员将需要设置管路的位置放样标出;S2:挖槽准备,掀开放样位置两侧的石板、破除石板下的混凝土;S3:挖槽,在放样位置的两侧开始土方作业,挖出便于施工的坑槽;S4:水钻横向打孔,施工人员在两侧分别沿着放样方向相对开始水钻打孔作业,直至双方连通;S5:横向布管,将塑管插装到水钻打出的孔洞内,并进行固定,作为横向管;S6:纵向布管,利用弯头将塑管和横向布置的塑管进行连接,并进行固定,作为纵向管;S7:恢复作业;本发明具有施工作业时间短、影响小、成本低的特点。
Scenic spot large-pedestrian-flow construction method
一种景区人流量大处施工方法
YIN LINAN (Autor:in) / LI RUNYAO (Autor:in) / LIU GANG (Autor:in) / BAI YANJUN (Autor:in) / CHENG FENFEI (Autor:in)
30.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Scenic spot fabricated building construction equipment and using method
Europäisches Patentamt | 2021
|Scenic spot modular building construction equipment and using method
Europäisches Patentamt | 2021
|