Construction method of scenic spot steps
The construction method comprises the steps that a clamping mechanism is arranged, a stone strip is clamped through the clamping mechanism, a grooving formwork is laid on the to-be-machined surface of the clamped stone strip, grooving treatment is conducted along a guide strip hole in the grooving formwork through a grooving electric pick, and therefore a groove is formed in the stone strip. According to the scheme provided by the invention, the stone strip is reliably clamped through the clamping mechanism, so that the to-be-machined surface of the stone strip is the upper surface of the stone strip, then the grooving template is arranged on the upper surface of the stone strip, and a groove is formed along the guide strip hole in the template by adopting a drill bit on an electric pick; therefore, rapid and reliable grooving treatment on the stone strips is achieved.
本发明涉及一种景区台阶的施工方法,设置一个夹持机构,采用夹持机构对石条进行夹装,在夹装后的石条的待加工表面铺设开槽模板,采用开槽电镐沿着开槽模板上的导向条孔进行开槽处理从而在石条上开设凹槽。本发明提供的上述方案,通过夹持机构对石条进行可靠的夹装,使得石条的待加工表面为石条的上表面,然后在石条的上表面上设置开槽模板,采用电镐上的钻头沿着模板上的导向条孔进行开设凹槽,从而实现对石条的快速可靠的开槽处理。
Construction method of scenic spot steps
The construction method comprises the steps that a clamping mechanism is arranged, a stone strip is clamped through the clamping mechanism, a grooving formwork is laid on the to-be-machined surface of the clamped stone strip, grooving treatment is conducted along a guide strip hole in the grooving formwork through a grooving electric pick, and therefore a groove is formed in the stone strip. According to the scheme provided by the invention, the stone strip is reliably clamped through the clamping mechanism, so that the to-be-machined surface of the stone strip is the upper surface of the stone strip, then the grooving template is arranged on the upper surface of the stone strip, and a groove is formed along the guide strip hole in the template by adopting a drill bit on an electric pick; therefore, rapid and reliable grooving treatment on the stone strips is achieved.
本发明涉及一种景区台阶的施工方法,设置一个夹持机构,采用夹持机构对石条进行夹装,在夹装后的石条的待加工表面铺设开槽模板,采用开槽电镐沿着开槽模板上的导向条孔进行开槽处理从而在石条上开设凹槽。本发明提供的上述方案,通过夹持机构对石条进行可靠的夹装,使得石条的待加工表面为石条的上表面,然后在石条的上表面上设置开槽模板,采用电镐上的钻头沿着模板上的导向条孔进行开设凹槽,从而实现对石条的快速可靠的开槽处理。
Construction method of scenic spot steps
一种景区台阶的施工方法
WANG JINYAN (Autor:in) / WANG HOU (Autor:in) / WANG FAXIANG (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
Scenic spot large-pedestrian-flow construction method
Europäisches Patentamt | 2021
|Scenic spot fabricated building construction equipment and using method
Europäisches Patentamt | 2021
|Scenic spot modular building construction equipment and using method
Europäisches Patentamt | 2021
|Healthy footpath scenic-spot construction method for municipal landscape mountain
Europäisches Patentamt | 2020
|