Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway roadbed and construction method thereof
The invention provides a highway roadbed and a construction method thereof, and relates to the technical field of roadbeds. The highway roadbed comprises a tamped foundation, a first open pipe and a second open pipe are arranged on the surface of the tamped foundation, a second steel wire mesh is fixedly connected to openings of the first open pipe and the second open pipe, the surface of the second steel wire mesh is wrapped with a plastic foam layer, the first open pipe and the second open pipe are vertically fixed, and the first open pipe and the second open pipe are fixedly connected with the plastic foam layer. A fixed plate is fixedly connected between the first opening pipes. An open pipe framework is fixed to the tamped foundation in an anchoring mode. After stone is laid and filled, the first steel wire mesh and the gravel act, the installation stability of the open pipe framework is improved, damping can be achieved, gaps of the gravel sublayers can provide a deformation space for cold and hot deformation of the highway. A photoelectric communication line can be arranged in the open pipe framework, the asphalt pavement can be cooled after water injection, and the open pipe framework can also be used for drainage.
本发明提供一种高速路公路路基及其施工方法,涉及路基技术领域。该高速路公路路基,包括夯实地基,所述夯实地基的表面设置有第一开口管和第二开口管,所述第一开口管和第二开口管的开口处固定连接有第二钢丝网,所述第二钢丝网的表面包裹有塑料泡沫层,所述第一开口管和第二开口管垂直固定,所述第一开口管之间固定连接有固定板。通过锚固的方式将开口管架构固定在夯实地基上,在铺填石子后,第一钢丝网与碎石子进行作用,提高开口管架构安装的稳定性,还可以进行减震,碎石子层的间隙可以为高速路公路冷热变形提供变形空间,在开口管架构内可以可布置光电通信线路,在注水后可对柏油路面进行降温,还可以做排水用。
Highway roadbed and construction method thereof
The invention provides a highway roadbed and a construction method thereof, and relates to the technical field of roadbeds. The highway roadbed comprises a tamped foundation, a first open pipe and a second open pipe are arranged on the surface of the tamped foundation, a second steel wire mesh is fixedly connected to openings of the first open pipe and the second open pipe, the surface of the second steel wire mesh is wrapped with a plastic foam layer, the first open pipe and the second open pipe are vertically fixed, and the first open pipe and the second open pipe are fixedly connected with the plastic foam layer. A fixed plate is fixedly connected between the first opening pipes. An open pipe framework is fixed to the tamped foundation in an anchoring mode. After stone is laid and filled, the first steel wire mesh and the gravel act, the installation stability of the open pipe framework is improved, damping can be achieved, gaps of the gravel sublayers can provide a deformation space for cold and hot deformation of the highway. A photoelectric communication line can be arranged in the open pipe framework, the asphalt pavement can be cooled after water injection, and the open pipe framework can also be used for drainage.
本发明提供一种高速路公路路基及其施工方法,涉及路基技术领域。该高速路公路路基,包括夯实地基,所述夯实地基的表面设置有第一开口管和第二开口管,所述第一开口管和第二开口管的开口处固定连接有第二钢丝网,所述第二钢丝网的表面包裹有塑料泡沫层,所述第一开口管和第二开口管垂直固定,所述第一开口管之间固定连接有固定板。通过锚固的方式将开口管架构固定在夯实地基上,在铺填石子后,第一钢丝网与碎石子进行作用,提高开口管架构安装的稳定性,还可以进行减震,碎石子层的间隙可以为高速路公路冷热变形提供变形空间,在开口管架构内可以可布置光电通信线路,在注水后可对柏油路面进行降温,还可以做排水用。
Highway roadbed and construction method thereof
一种高速路公路路基及其施工方法
JI XIAOBAO (Autor:in) / YU JIANLEI (Autor:in) / YANG BIN (Autor:in) / HE SHUBO (Autor:in) / WANG RUNSHENG (Autor:in) / ZHANG LULU (Autor:in) / GUO WENDONG (Autor:in)
28.05.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Highway roadbed structure and construction method thereof
Europäisches Patentamt | 2024
|Highway bridge roadbed pavement and construction method thereof
Europäisches Patentamt | 2022
|