Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel heat preservation decoration construction process for building outer wall
The invention belongs to the technical field of heat preservation decoration equipment, and particularly discloses a novel heat preservation decoration construction process for a building outer wall. The novel heat preservation decoration construction process comprises the following steps that S1, the building outer wall is cleaned up; S2, a mounting base of a heat preservation wallboard is fixedly mounted on the building outer wall; S3, after the mounting base is mounted, heat preservation mortar spraying is conducted on the building outer wall; and S4, after the heat preservation mortar is dried, the heat preservation wallboard is mounted on the mounting base. According to the novel heat preservation decoration construction process for the building outer wall, the heat preservation performance of the building outer wall can be effectively improved, meanwhile, mounting and dismounting of the heat preservation wallboard are facilitated, the stability is improved, the arranged heat preservation wallboard is low in mass, carrying is convenient, and the practicability is high.
本发明属于保温装饰设备技术领域,具体公开了一种建筑外墙新型保温装饰施工工艺,包括以下步骤:S1、对建筑外墙进行清理干净;S2、将保温墙板的安装底座固定安装在建筑外墙上;S3、安装好安装底座后,对建筑外墙进行保温砂浆喷涂;S4、待保温砂浆晾干后,将保温墙板安装在安装底座上。本发明能够有效提高建筑外墙的保温性能,同时方便保温墙板的安装拆卸,提高稳定度,设置的保温墙板质量轻,便于搬运,实用性强。
Novel heat preservation decoration construction process for building outer wall
The invention belongs to the technical field of heat preservation decoration equipment, and particularly discloses a novel heat preservation decoration construction process for a building outer wall. The novel heat preservation decoration construction process comprises the following steps that S1, the building outer wall is cleaned up; S2, a mounting base of a heat preservation wallboard is fixedly mounted on the building outer wall; S3, after the mounting base is mounted, heat preservation mortar spraying is conducted on the building outer wall; and S4, after the heat preservation mortar is dried, the heat preservation wallboard is mounted on the mounting base. According to the novel heat preservation decoration construction process for the building outer wall, the heat preservation performance of the building outer wall can be effectively improved, meanwhile, mounting and dismounting of the heat preservation wallboard are facilitated, the stability is improved, the arranged heat preservation wallboard is low in mass, carrying is convenient, and the practicability is high.
本发明属于保温装饰设备技术领域,具体公开了一种建筑外墙新型保温装饰施工工艺,包括以下步骤:S1、对建筑外墙进行清理干净;S2、将保温墙板的安装底座固定安装在建筑外墙上;S3、安装好安装底座后,对建筑外墙进行保温砂浆喷涂;S4、待保温砂浆晾干后,将保温墙板安装在安装底座上。本发明能够有效提高建筑外墙的保温性能,同时方便保温墙板的安装拆卸,提高稳定度,设置的保温墙板质量轻,便于搬运,实用性强。
Novel heat preservation decoration construction process for building outer wall
一种建筑外墙新型保温装饰施工工艺
YANG CHUNCHUN (Autor:in) / YANG YUEBING (Autor:in) / KONG RONGSHENG (Autor:in)
28.05.2021
Patent
Elektronische Ressource
Chinesisch
Novel heat-preservation decoration construction technology for building outer wall
Europäisches Patentamt | 2020
|Building outer wall heat preservation and decoration integrated construction device
Europäisches Patentamt | 2021
|Building decoration outer wall with heat preservation function
Europäisches Patentamt | 2024
|Building outer wall heat preservation and decoration integrated construction device and method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|