Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method
The invention discloses bridge engineering bridge deck leveling layer hollowing filling equipment and a construction method, and relates to the technical field of building construction equipment. The equipment comprises a cylinder body, the cylinder body is fixedly mounted on the movable frame; a cylinder cover is mounted at the top end of the cylinder body; a plurality of groups of arc-shaped slideways arranged in the circumferential direction are fixed on the inner surface of the barrel body; two sliding grooves are symmetrically formed in the circumferential side face of the barrel in the axial direction. A pouring barrel is mounted on the upper surface of the barrel cover; a supporting column is fixedly mounted in the middle of the lower surface of the barrel cover; and a plurality of first annular sliding ways are rotationally connected to the supporting column. The three hollow fan-shaped columns are intermittently driven by the driving mechanism to do annular motion in the cylinder, and the knocking mechanism, the electric drill and the pouring pipe are sequentially controlled by the lifting assembly to ascend and descend, so that hollowing positioning, drilling and filling are achieved; in the process, the construction amount can be reduced, the labor pressure and the maintenance cost of people are reduced, and the hollowing filling efficiency is improved.
本发明公开了一种桥梁工程桥面调平层空鼓填充设备及施工方法,涉及建筑施工设备技术领域。本发明包括筒体;筒体固定安装在移动架上;筒体的顶端安装有一筒盖;筒体的内表面固定有呈周向方向设置的若干组弧形滑道;筒体的周侧面沿轴向方向上对称开有两滑槽;筒盖的上表面安装有一浇筑桶;筒盖的下表面中部固定安装有一支撑柱;支撑柱上转动连接有若干第一环形滑道。本发明通过驱动机构来间歇式驱动三个空心扇形柱在筒体内做环形运动,并利用升降组件来分别依次控制敲击机构、电钻和浇筑管进行升降,从而实现空鼓的定位、钻孔和填充;此过程可降低施工量,减轻人们的劳动压力和维修成本,并提高空鼓的填补效率。
Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method
The invention discloses bridge engineering bridge deck leveling layer hollowing filling equipment and a construction method, and relates to the technical field of building construction equipment. The equipment comprises a cylinder body, the cylinder body is fixedly mounted on the movable frame; a cylinder cover is mounted at the top end of the cylinder body; a plurality of groups of arc-shaped slideways arranged in the circumferential direction are fixed on the inner surface of the barrel body; two sliding grooves are symmetrically formed in the circumferential side face of the barrel in the axial direction. A pouring barrel is mounted on the upper surface of the barrel cover; a supporting column is fixedly mounted in the middle of the lower surface of the barrel cover; and a plurality of first annular sliding ways are rotationally connected to the supporting column. The three hollow fan-shaped columns are intermittently driven by the driving mechanism to do annular motion in the cylinder, and the knocking mechanism, the electric drill and the pouring pipe are sequentially controlled by the lifting assembly to ascend and descend, so that hollowing positioning, drilling and filling are achieved; in the process, the construction amount can be reduced, the labor pressure and the maintenance cost of people are reduced, and the hollowing filling efficiency is improved.
本发明公开了一种桥梁工程桥面调平层空鼓填充设备及施工方法,涉及建筑施工设备技术领域。本发明包括筒体;筒体固定安装在移动架上;筒体的顶端安装有一筒盖;筒体的内表面固定有呈周向方向设置的若干组弧形滑道;筒体的周侧面沿轴向方向上对称开有两滑槽;筒盖的上表面安装有一浇筑桶;筒盖的下表面中部固定安装有一支撑柱;支撑柱上转动连接有若干第一环形滑道。本发明通过驱动机构来间歇式驱动三个空心扇形柱在筒体内做环形运动,并利用升降组件来分别依次控制敲击机构、电钻和浇筑管进行升降,从而实现空鼓的定位、钻孔和填充;此过程可降低施工量,减轻人们的劳动压力和维修成本,并提高空鼓的填补效率。
Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method
一种桥梁工程桥面调平层空鼓填充设备及施工方法
WANG LEI (Autor:in) / AI SHENGRUI (Autor:in) / WU GUANGCHAO (Autor:in) / FAN WENCHENG (Autor:in) / SUN HONGTU (Autor:in) / LI DONG (Autor:in) / LI GUOYU (Autor:in) / LU FEI (Autor:in) / WANG SHIHUI (Autor:in) / QIN TIANLIN (Autor:in)
01.06.2021
Patent
Elektronische Ressource
Chinesisch
Hollowing-prevention cracking-prevention process of concrete floor leveling layer
Europäisches Patentamt | 2020
|Bridge leveling layer, bridge and construction method
Europäisches Patentamt | 2024
|