Continuous bare concrete prefabricated stand plate and construction method thereof
The invention relates to a continuous bare concrete prefabricated stand plate and a construction method thereof. The method comprises the following steps of preparing a prefabricated stand plate with three continuous step structures, wherein a fixed piece is arranged at the bottom of the prepared prefabricated stand plate, and a hoisting piece is arranged on the side of the prepared prefabricated stand plate; hoisting the prefabricated stand plate to a stand beam through the hoisting piece, and inserting the fixed piece into an inserting groove formed in the stand beam; adjusting the mounting position of the prefabricated stand plate, and pouring grouting materials into the inserting groove so as to anchor the fixed piece after the mounting position is adjusted, so that the prefabricated stand plate is fixedly connected with the stand beam; and arranging sealing glue at the butt seam of two adjacent prefabricated stand plates for sealing connection, so that the construction of the prefabricated stand plate is completed. According to the continuous bare concrete prefabricated stand plate, the component size is increased, the total number of components is reduced, each component is simple in process tracking, the whole component is hoisted, the operation frequency is low, and the labor cost is reduced.
本发明涉及一种连续式清水混凝土预制看台板及其施工方法,该方法包括如下步骤:制备具有连续的三个台阶结构的预制看台板,所制备的预制看台板的底部设有固定件,侧部设有吊装件;通过所述吊装件将所述预制看台板吊装至看台梁上,并让所述固定件插入所述看台梁上设置的插接槽内;调整所述预制看台板的安装位置,调整好安装位置后,向所述插接槽内灌注灌浆料以锚固所述固定件,从而将所述预制看台板与所述看台梁固定连接;于相邻的两个预制看台板的对接缝处设置密封胶进行密封连接,从而完成预制看台板的施工。本发明的构件尺寸增大,减小总体构件数量,每个构件过程跟踪简单,整块吊装,操作次数少,节约人工成本。
Continuous bare concrete prefabricated stand plate and construction method thereof
The invention relates to a continuous bare concrete prefabricated stand plate and a construction method thereof. The method comprises the following steps of preparing a prefabricated stand plate with three continuous step structures, wherein a fixed piece is arranged at the bottom of the prepared prefabricated stand plate, and a hoisting piece is arranged on the side of the prepared prefabricated stand plate; hoisting the prefabricated stand plate to a stand beam through the hoisting piece, and inserting the fixed piece into an inserting groove formed in the stand beam; adjusting the mounting position of the prefabricated stand plate, and pouring grouting materials into the inserting groove so as to anchor the fixed piece after the mounting position is adjusted, so that the prefabricated stand plate is fixedly connected with the stand beam; and arranging sealing glue at the butt seam of two adjacent prefabricated stand plates for sealing connection, so that the construction of the prefabricated stand plate is completed. According to the continuous bare concrete prefabricated stand plate, the component size is increased, the total number of components is reduced, each component is simple in process tracking, the whole component is hoisted, the operation frequency is low, and the labor cost is reduced.
本发明涉及一种连续式清水混凝土预制看台板及其施工方法,该方法包括如下步骤:制备具有连续的三个台阶结构的预制看台板,所制备的预制看台板的底部设有固定件,侧部设有吊装件;通过所述吊装件将所述预制看台板吊装至看台梁上,并让所述固定件插入所述看台梁上设置的插接槽内;调整所述预制看台板的安装位置,调整好安装位置后,向所述插接槽内灌注灌浆料以锚固所述固定件,从而将所述预制看台板与所述看台梁固定连接;于相邻的两个预制看台板的对接缝处设置密封胶进行密封连接,从而完成预制看台板的施工。本发明的构件尺寸增大,减小总体构件数量,每个构件过程跟踪简单,整块吊装,操作次数少,节约人工成本。
Continuous bare concrete prefabricated stand plate and construction method thereof
连续式清水混凝土预制看台板及其施工方法
OU YAZHOU (Autor:in) / ZHANG DECAI (Autor:in)
01.06.2021
Patent
Elektronische Ressource
Chinesisch
Construction method of prefabricated fair-faced concrete stand plate
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Fabricated bare concrete background wall prefabricated hidden door structure construction method
Europäisches Patentamt | 2024
|Reinforced concrete prefabricated cover plate and construction method thereof
Europäisches Patentamt | 2023
|