Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for steel belt hanging plate of infilled wall
The invention relates to a construction method for a steel belt hanging plate of an infilled wall. The construction method comprises the following steps that S1, wall penetrating bolts are pre-embedded in a wall body; S2, vertical steel belts are at least installed on the outer wall face, specifically, the steel belts are fixed to the filling wall body, an upper beam and a lower beam through the wall penetrating bolts, and the steel belts are arranged in the horizontal direction at intervals; and S3, a plate is installed, specifically, the plate is installed on the wall body through a plate hanging piece, and the plate hanging piece is in threaded connection with the steel belts and the wall body. According to the construction method, the steel belts are clamped to the wall body through the wall penetrating bolts, and the plate, the steel belts and the wall body form a whole, so that the deformation of the exterior facing meets the requirement, the anti-seismic grade of a building meets the requirement, a double-hook pendant body can firmly grasp the plate like an eagle claw, can be independently hung, and is convenient to use, the installed plate is high in wind pressure resistance, difficult to fall off, high in safety coefficient and particularly suitable for high-rise buildings.
本发明涉及填充墙钢带挂板施工方法,包括以下步骤:S1,穿墙螺栓预先埋设于墙体内;S2,至少在外墙面安装竖向的钢带:钢带通过穿墙螺栓固定于填充墙体、上梁和下梁上,钢带水平方向间隔设置;S3,安装板材:板材通过板材挂件装于墙体上,板材挂件与所述钢带及墙体螺纹联接。本发明的钢带因穿墙螺栓与墙体夹紧,板材、钢带与墙体形成一体,使得外饰面变形满足要求,使得建筑物的抗震等级满足要求;本发明的双钩挂件体可像鹰爪一样牢牢抓住板材,其可独立挂载,使用方便;安装的板材防风压性能强,难以脱落,安全系数高,尤其适用于高层建筑。
Construction method for steel belt hanging plate of infilled wall
The invention relates to a construction method for a steel belt hanging plate of an infilled wall. The construction method comprises the following steps that S1, wall penetrating bolts are pre-embedded in a wall body; S2, vertical steel belts are at least installed on the outer wall face, specifically, the steel belts are fixed to the filling wall body, an upper beam and a lower beam through the wall penetrating bolts, and the steel belts are arranged in the horizontal direction at intervals; and S3, a plate is installed, specifically, the plate is installed on the wall body through a plate hanging piece, and the plate hanging piece is in threaded connection with the steel belts and the wall body. According to the construction method, the steel belts are clamped to the wall body through the wall penetrating bolts, and the plate, the steel belts and the wall body form a whole, so that the deformation of the exterior facing meets the requirement, the anti-seismic grade of a building meets the requirement, a double-hook pendant body can firmly grasp the plate like an eagle claw, can be independently hung, and is convenient to use, the installed plate is high in wind pressure resistance, difficult to fall off, high in safety coefficient and particularly suitable for high-rise buildings.
本发明涉及填充墙钢带挂板施工方法,包括以下步骤:S1,穿墙螺栓预先埋设于墙体内;S2,至少在外墙面安装竖向的钢带:钢带通过穿墙螺栓固定于填充墙体、上梁和下梁上,钢带水平方向间隔设置;S3,安装板材:板材通过板材挂件装于墙体上,板材挂件与所述钢带及墙体螺纹联接。本发明的钢带因穿墙螺栓与墙体夹紧,板材、钢带与墙体形成一体,使得外饰面变形满足要求,使得建筑物的抗震等级满足要求;本发明的双钩挂件体可像鹰爪一样牢牢抓住板材,其可独立挂载,使用方便;安装的板材防风压性能强,难以脱落,安全系数高,尤其适用于高层建筑。
Construction method for steel belt hanging plate of infilled wall
填充墙钢带挂板施工方法
MU YANGQING (Autor:in) / MU YONG (Autor:in) / GAO BAOTIAN (Autor:in) / SI WEI (Autor:in)
04.06.2021
Patent
Elektronische Ressource
Chinesisch
Double-layer profiled steel plate reinforced infilled-wall frame and construction method thereof
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|Hanging basket for steel plate shear wall construction
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|