Construction method for additionally building new corridor below old corridor in old building
The invention relates to a construction method for additionally building a new corridor below an old corridor in an old building. The construction method comprises the following steps of (S1) lifting a steel beam to a feeding platform in multiple sections; (S2) conveying the multiple sections of steel beams to a corridor in a building from a side opening along a feeding rail; (S3) transferring the multiple sections of steel beams on the feeding rail to a conveying rail, then rotating to a mounting rail, and mutually connecting the multiple sections of steel beams in a mounting room so as to form a complete steel beam; (S4) lifting and moving the steel beam to the mouting position; and (S5) fixing a beam support to the position, which is located below a mounting floor, of an original beam in the building, so that both ends of the steel beam are located between the mounting floor and the beam support, and then fixing the both ends of the steel beam to the original beam, so that the entrance installation of the steel beam can be completed. The construction method has the effect that the new corridor can be additionally built below the old corridor in the old building.
本申请涉及一种旧有建筑物内在旧有连廊下方加建新连廊的施工方法,其包括以下步骤:S1、将一根钢梁分成多节吊到进料平台上;S2、将多节钢梁从侧口处沿进料轨道运送至建筑物内部的走廊上;S3、将进料轨道上的多节钢梁转运至传送轨道上,再转动至安装轨道上,将安装房间内的多节钢梁进行相互连接形成完整的一个钢梁;S4、将钢梁吊装并移动至安装位置;S5、往建筑物内原有梁位于安装楼板下方的位置固定梁托,使得钢梁的两端均位于安装楼板和梁托之间,再将钢梁的两端与原有梁固定,即可完成钢梁的入场安装。本申请具有能够在旧有建筑物内的旧有连廊下方加建连廊的效果。
Construction method for additionally building new corridor below old corridor in old building
The invention relates to a construction method for additionally building a new corridor below an old corridor in an old building. The construction method comprises the following steps of (S1) lifting a steel beam to a feeding platform in multiple sections; (S2) conveying the multiple sections of steel beams to a corridor in a building from a side opening along a feeding rail; (S3) transferring the multiple sections of steel beams on the feeding rail to a conveying rail, then rotating to a mounting rail, and mutually connecting the multiple sections of steel beams in a mounting room so as to form a complete steel beam; (S4) lifting and moving the steel beam to the mouting position; and (S5) fixing a beam support to the position, which is located below a mounting floor, of an original beam in the building, so that both ends of the steel beam are located between the mounting floor and the beam support, and then fixing the both ends of the steel beam to the original beam, so that the entrance installation of the steel beam can be completed. The construction method has the effect that the new corridor can be additionally built below the old corridor in the old building.
本申请涉及一种旧有建筑物内在旧有连廊下方加建新连廊的施工方法,其包括以下步骤:S1、将一根钢梁分成多节吊到进料平台上;S2、将多节钢梁从侧口处沿进料轨道运送至建筑物内部的走廊上;S3、将进料轨道上的多节钢梁转运至传送轨道上,再转动至安装轨道上,将安装房间内的多节钢梁进行相互连接形成完整的一个钢梁;S4、将钢梁吊装并移动至安装位置;S5、往建筑物内原有梁位于安装楼板下方的位置固定梁托,使得钢梁的两端均位于安装楼板和梁托之间,再将钢梁的两端与原有梁固定,即可完成钢梁的入场安装。本申请具有能够在旧有建筑物内的旧有连廊下方加建连廊的效果。
Construction method for additionally building new corridor below old corridor in old building
一种旧有建筑物内在旧有连廊下方加建新连廊的施工方法
LUO WEIJUN (Autor:in) / ZENG XIAOWEN (Autor:in) / LIU WENYA (Autor:in) / HE GUANLIANG (Autor:in) / ZHU QIYU (Autor:in) / XIE JIE (Autor:in) / GUO JIALONG (Autor:in) / XIE ZHENGGUO (Autor:in)
11.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Connecting joint, corridor structure and modularized additionally-installed elevator
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Fabricated building corridor and construction method thereof
Europäisches Patentamt | 2024
|