Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid installation structure of prefabricated inspection well ring of asphalt pavement
The invention relates to a rapid installation structure of a prefabricated inspection well ring of an asphalt pavement. The rapid installation structure comprises an outer ring connected to the upper end face of a barrel body and an inner ring connected into the outer ring; the inner ring is connected with a well lid used for covering an opening of the barrel body; a plurality of horizontally-arranged positioning nets embedded in asphalt are fixed to the outer wall of the outer ring; each positioning net is provided with a plurality of reinforcing rods connected with the adjacent positioning net; and each positioning net is provided with a plurality of supporting assemblies supporting the positioning net. After the outer ring and the positioning nets are installed, the asphalt is poured, and the upper surfaces of the positioning nets and the upper surface of the outer ring are flush with the ground. The rapid installation structure has the advantage that the possibility of pavement collapse around the inspection well lid is reduced.
本申请涉及一种沥青路面预制检查井圈快速安装结构,包括连接在筒身上端面外圈、连接在所述外圈内的内圈,所述内圈上连接有用于覆盖筒身开口的井盖,所述外圈外壁固定有若干呈水平设置的且预埋在沥青里的定位网,所述定位网上设置有连接相邻所述定位网的若干加强杆,所述定位网上设置有若干支撑所述定位网的支撑组件。外圈和定位网安装好后,浇筑沥青,使定位网上表面、外圈上表面与地面齐平。本申请具有减小窨井盖周围路面塌陷的可能。
Rapid installation structure of prefabricated inspection well ring of asphalt pavement
The invention relates to a rapid installation structure of a prefabricated inspection well ring of an asphalt pavement. The rapid installation structure comprises an outer ring connected to the upper end face of a barrel body and an inner ring connected into the outer ring; the inner ring is connected with a well lid used for covering an opening of the barrel body; a plurality of horizontally-arranged positioning nets embedded in asphalt are fixed to the outer wall of the outer ring; each positioning net is provided with a plurality of reinforcing rods connected with the adjacent positioning net; and each positioning net is provided with a plurality of supporting assemblies supporting the positioning net. After the outer ring and the positioning nets are installed, the asphalt is poured, and the upper surfaces of the positioning nets and the upper surface of the outer ring are flush with the ground. The rapid installation structure has the advantage that the possibility of pavement collapse around the inspection well lid is reduced.
本申请涉及一种沥青路面预制检查井圈快速安装结构,包括连接在筒身上端面外圈、连接在所述外圈内的内圈,所述内圈上连接有用于覆盖筒身开口的井盖,所述外圈外壁固定有若干呈水平设置的且预埋在沥青里的定位网,所述定位网上设置有连接相邻所述定位网的若干加强杆,所述定位网上设置有若干支撑所述定位网的支撑组件。外圈和定位网安装好后,浇筑沥青,使定位网上表面、外圈上表面与地面齐平。本申请具有减小窨井盖周围路面塌陷的可能。
Rapid installation structure of prefabricated inspection well ring of asphalt pavement
一种沥青路面预制检查井圈快速安装结构
LI ZHENGPING (Autor:in) / QIU ERKANG (Autor:in) / ZHU LEIHONG (Autor:in) / CHEN YANGBING (Autor:in) / ZHANG HONGLI (Autor:in)
18.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reinforcing structure of asphalt pavement inspection well
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Step post-installation method of prefabricated inspection well
Europäisches Patentamt | 2023
|Process for lifting asphalt pavement inspection well and lifting structure
Europäisches Patentamt | 2015
|Prefabricated tunnel asphalt pavement structure and assembly process thereof
Europäisches Patentamt | 2024
|