Floor slab post-cast strip concrete pouring formwork supporting method and formwork supporting structure
The invention provides a floor slab post-cast strip concrete pouring formwork supporting method and a formwork supporting structure. The problem of two-time supporting of a post-cast strip formwork is solved. The method comprises the steps that 1, two-time pouring formwork supporting systems are arranged on the two sides of a post-cast strip, and the rest are one-time pouring formwork supporting systems; 2, a bottom formwork of a pre-cast floor slab and a post-cast strip reserved formwork are arranged on the supporting systems correspondingly; and 3, the one-time pouring formwork supporting systems are dismounted, and a post-cast strip pouring formwork is arranged for the second time. The formwork supporting structure comprises floor slab supporting frames, a floor slab bottom face formwork supporting frame and a middle supporting frame; the floor slab supporting frames are arranged according to the connecting ends of the floor slab and the post-cast strip; a post-cast strip pouring formwork supporting beam is arranged between every two adjacent floor slab supporting frames; the bottom face formwork, the floor slab bottom face formwork supporting frame and the middle supporting frame form a supporting structure through bottom face formwork battens; and the bottom face formwork and a top plate at the top end of the floor slab bottom face formwork supporting frame form a floor slab bottom face formwork. The floor slab post-cast strip concrete pouring formwork supporting method and the formwork supporting structure have the beneficial effects that the service cycle and the erecting and dismounting frequency of the formworks are reduced, cost is reduced, and structural stress is not affected.
一种楼板后浇带混凝土浇筑支模方法及模板支撑结构,解决后浇带模板两次支撑问题,方法是:1.在后浇带两测,设置两次浇筑模板支撑体系,其余为一次浇筑模板支撑体系,2.在支撑体系分别设置预浇楼板的底部模板和后浇带预留模板,3.拆除一次浇筑模板支撑体系,二次设置后浇带浇筑模板。模板支撑结构包括:楼板支撑架、楼板底面模板支撑架和中间支撑架,楼板支撑架按楼板与后浇带的连接端设置,楼板支撑架相邻之间设置有后浇带浇筑模板支撑梁,底面模板经底面模板木方与楼板底面模板支撑架构和中间支撑架成支撑结构,底面模板与楼板底面模板支撑架顶端的顶板构成楼板底面模板。有益效果是:降低模板的使用周期和搭拆次数,减少成本,结构受力不影响。
Floor slab post-cast strip concrete pouring formwork supporting method and formwork supporting structure
The invention provides a floor slab post-cast strip concrete pouring formwork supporting method and a formwork supporting structure. The problem of two-time supporting of a post-cast strip formwork is solved. The method comprises the steps that 1, two-time pouring formwork supporting systems are arranged on the two sides of a post-cast strip, and the rest are one-time pouring formwork supporting systems; 2, a bottom formwork of a pre-cast floor slab and a post-cast strip reserved formwork are arranged on the supporting systems correspondingly; and 3, the one-time pouring formwork supporting systems are dismounted, and a post-cast strip pouring formwork is arranged for the second time. The formwork supporting structure comprises floor slab supporting frames, a floor slab bottom face formwork supporting frame and a middle supporting frame; the floor slab supporting frames are arranged according to the connecting ends of the floor slab and the post-cast strip; a post-cast strip pouring formwork supporting beam is arranged between every two adjacent floor slab supporting frames; the bottom face formwork, the floor slab bottom face formwork supporting frame and the middle supporting frame form a supporting structure through bottom face formwork battens; and the bottom face formwork and a top plate at the top end of the floor slab bottom face formwork supporting frame form a floor slab bottom face formwork. The floor slab post-cast strip concrete pouring formwork supporting method and the formwork supporting structure have the beneficial effects that the service cycle and the erecting and dismounting frequency of the formworks are reduced, cost is reduced, and structural stress is not affected.
一种楼板后浇带混凝土浇筑支模方法及模板支撑结构,解决后浇带模板两次支撑问题,方法是:1.在后浇带两测,设置两次浇筑模板支撑体系,其余为一次浇筑模板支撑体系,2.在支撑体系分别设置预浇楼板的底部模板和后浇带预留模板,3.拆除一次浇筑模板支撑体系,二次设置后浇带浇筑模板。模板支撑结构包括:楼板支撑架、楼板底面模板支撑架和中间支撑架,楼板支撑架按楼板与后浇带的连接端设置,楼板支撑架相邻之间设置有后浇带浇筑模板支撑梁,底面模板经底面模板木方与楼板底面模板支撑架构和中间支撑架成支撑结构,底面模板与楼板底面模板支撑架顶端的顶板构成楼板底面模板。有益效果是:降低模板的使用周期和搭拆次数,减少成本,结构受力不影响。
Floor slab post-cast strip concrete pouring formwork supporting method and formwork supporting structure
一种楼板后浇带混凝土浇筑支模方法及模板支撑结构
WU ZIQUAN (Autor:in) / HE DONGJIN (Autor:in) / CAI XIJIE (Autor:in) / LI CHENGUANG (Autor:in) / SHU YUNCONG (Autor:in) / WU SHUNJIE (Autor:in) / CHEN ZHIYUAN (Autor:in)
18.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork supporting device for fixing post-cast strip formwork
Europäisches Patentamt | 2023
|Floor post-cast strip formwork erecting formwork structure
Europäisches Patentamt | 2023
|Method and structure for pouring concrete floor post-cast strip through inflatable formwork
Europäisches Patentamt | 2020
|Supporting-free formwork structure and high-altitude cantilever floor slab pouring method
Europäisches Patentamt | 2022
|