Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Single-side floor slab cantilever slab system of core tube climbing frame and construction method thereof
The invention discloses a single-side floor slab cantilever slab system of a core tube climbing frame and a construction method thereof. The single-side floor slab cantilever slab system comprises a bottom plate, wherein the bottom of the bottom plate is fixedly connected with pulleys, the top of the bottom plate is provided with a supporting mechanism, the top of the supporting mechanism is provided with a cantilever slab mounting unit, the cantilever slab mounting unit comprises a connecting mechanism and an anti-moving mechanism, and the connecting mechanism comprises a first upper cantilever slab, a lower cantilever slab and a second upper cantilever slab which is symmetrical to the first upper cantilever slab. The invention relates to the technical field of climbing frames. According to the single-side floor slab cantilever slab system of the core tube climbing frame and the construction method thereof, the connecting mechanism is arranged, the first upper cantilever slab and the second upper cantilever slab are placed on the same plane, a rotating handle is rotated, so that a clamping column is clamped with a limiting groove, meanwhile, the limiting column is clamped with the clamping groove, the first upper cantilever slab and the second upper cantilever slab can be fixed, the length of the cantilever slabs can be adjusted according to the situation, and meanwhile, the cantilever slab system is safer.
本发明公开了一种核心筒爬架的单侧楼板悬挑板系统及其施工方法,包括底板,底板的底部固定连接有滑轮,底板的顶部设置有支撑机构,支撑机构的顶部设置有悬挑板安装单元,悬挑板安装单元中包括有连接机构和防移动机构,连接机构中包括第一上悬挑板、下悬挑板和相互对称的第二上悬挑板,本发明涉及爬架技术领域。该核心筒爬架的单侧楼板悬挑板系统及其施工方法,通过设置有连接机构,将第一上悬挑板和第二上悬挑板放置在同一平面上,转动转动把手,使得卡柱与限位槽卡接,同时限位柱与卡槽进行卡接,不仅可以对第一上悬挑板和第二上悬挑板进行固定,而且可以使得悬挑板的长度根据情况进行调节,同时使得悬挑板系统更加的安全。
Single-side floor slab cantilever slab system of core tube climbing frame and construction method thereof
The invention discloses a single-side floor slab cantilever slab system of a core tube climbing frame and a construction method thereof. The single-side floor slab cantilever slab system comprises a bottom plate, wherein the bottom of the bottom plate is fixedly connected with pulleys, the top of the bottom plate is provided with a supporting mechanism, the top of the supporting mechanism is provided with a cantilever slab mounting unit, the cantilever slab mounting unit comprises a connecting mechanism and an anti-moving mechanism, and the connecting mechanism comprises a first upper cantilever slab, a lower cantilever slab and a second upper cantilever slab which is symmetrical to the first upper cantilever slab. The invention relates to the technical field of climbing frames. According to the single-side floor slab cantilever slab system of the core tube climbing frame and the construction method thereof, the connecting mechanism is arranged, the first upper cantilever slab and the second upper cantilever slab are placed on the same plane, a rotating handle is rotated, so that a clamping column is clamped with a limiting groove, meanwhile, the limiting column is clamped with the clamping groove, the first upper cantilever slab and the second upper cantilever slab can be fixed, the length of the cantilever slabs can be adjusted according to the situation, and meanwhile, the cantilever slab system is safer.
本发明公开了一种核心筒爬架的单侧楼板悬挑板系统及其施工方法,包括底板,底板的底部固定连接有滑轮,底板的顶部设置有支撑机构,支撑机构的顶部设置有悬挑板安装单元,悬挑板安装单元中包括有连接机构和防移动机构,连接机构中包括第一上悬挑板、下悬挑板和相互对称的第二上悬挑板,本发明涉及爬架技术领域。该核心筒爬架的单侧楼板悬挑板系统及其施工方法,通过设置有连接机构,将第一上悬挑板和第二上悬挑板放置在同一平面上,转动转动把手,使得卡柱与限位槽卡接,同时限位柱与卡槽进行卡接,不仅可以对第一上悬挑板和第二上悬挑板进行固定,而且可以使得悬挑板的长度根据情况进行调节,同时使得悬挑板系统更加的安全。
Single-side floor slab cantilever slab system of core tube climbing frame and construction method thereof
一种核心筒爬架的单侧楼板悬挑板系统及其施工方法
ZHANG YONGQING (Autor:in) / BAO FENG (Autor:in) / GU YONGJUN (Autor:in)
02.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Supporting system and method for integral construction of floor slab and cantilever slab
Europäisches Patentamt | 2023
|Construction method for modifying old cantilever prefabricated floor slab
Europäisches Patentamt | 2024
|Connecting assembly between construction climbing frame and floor slab supported by steel beam
Europäisches Patentamt | 2022
|Cantilever floor slab construction method under shaped space constraint condition
Europäisches Patentamt | 2024
|