High-rise prefabricated building integral operation platform, construction method and application thereof
The invention relates to the technical field of buildings, in particular to a high-rise prefabricated building integral operation platform, a construction method and application thereof. The operation platform comprises an operation platform body and a shear wall; the operation platform body comprises a main body structure and a hoisting structure; the main body structure comprises main beams, auxiliary beams and supporting columns; the supporting columns are installed on the shear wall through bearing distributors; the main beams are slidably connected with the supporting columns; the auxiliary beams are installed on the inner sides of the main beams; the hoisting structure is installed on the auxiliary beams; and the hoisting structure comprises an electric worm, a hoisting beam, a hanging steel cable and channel steel. A steel formwork is hoisted through the operation platform for the wall construction of a current floor. After a wall beam of the current floor is completed, the steel formwork is removed to control the operation platform to rise to a next floor, and then a laminated floor slab is placed. Finally, the laminated floor slab is mounted, so that the overall lifting of the steel formwork is realized, formwork mounting and dismounting time and operators are reduced, the labor cost is saved, and the construction period is shortened and the construction cost is saved by adopting the laminated floor slab for construction.
本发明涉及建筑技术领域,具体是一种高层装配式建筑整体作业平台及其施工方法与应用,包括作业平台和剪力墙,作业平台包括主体结构和吊装结构,主体结构包括主梁、副梁和支撑柱,支撑柱通过承重分配器安装于剪力墙,主梁滑动连接支撑柱,副梁安装于主梁内侧,吊装结构安装于副梁,吊装结构包括电动蜗杆、吊梁、挂接钢索和槽钢,通过作业平台吊装钢模板用于当前楼层墙体施工,当前楼层墙梁完成后,拆除钢模板控制作业平台上升至上一层,再放置叠合楼板,最后进行叠合楼板的安装,实现对钢模板整体提升,减少模板安装拆卸时间和操作人员,节省人力成本,并采用叠合楼板进行施工,缩短工期,节省施工成本。
High-rise prefabricated building integral operation platform, construction method and application thereof
The invention relates to the technical field of buildings, in particular to a high-rise prefabricated building integral operation platform, a construction method and application thereof. The operation platform comprises an operation platform body and a shear wall; the operation platform body comprises a main body structure and a hoisting structure; the main body structure comprises main beams, auxiliary beams and supporting columns; the supporting columns are installed on the shear wall through bearing distributors; the main beams are slidably connected with the supporting columns; the auxiliary beams are installed on the inner sides of the main beams; the hoisting structure is installed on the auxiliary beams; and the hoisting structure comprises an electric worm, a hoisting beam, a hanging steel cable and channel steel. A steel formwork is hoisted through the operation platform for the wall construction of a current floor. After a wall beam of the current floor is completed, the steel formwork is removed to control the operation platform to rise to a next floor, and then a laminated floor slab is placed. Finally, the laminated floor slab is mounted, so that the overall lifting of the steel formwork is realized, formwork mounting and dismounting time and operators are reduced, the labor cost is saved, and the construction period is shortened and the construction cost is saved by adopting the laminated floor slab for construction.
本发明涉及建筑技术领域,具体是一种高层装配式建筑整体作业平台及其施工方法与应用,包括作业平台和剪力墙,作业平台包括主体结构和吊装结构,主体结构包括主梁、副梁和支撑柱,支撑柱通过承重分配器安装于剪力墙,主梁滑动连接支撑柱,副梁安装于主梁内侧,吊装结构安装于副梁,吊装结构包括电动蜗杆、吊梁、挂接钢索和槽钢,通过作业平台吊装钢模板用于当前楼层墙体施工,当前楼层墙梁完成后,拆除钢模板控制作业平台上升至上一层,再放置叠合楼板,最后进行叠合楼板的安装,实现对钢模板整体提升,减少模板安装拆卸时间和操作人员,节省人力成本,并采用叠合楼板进行施工,缩短工期,节省施工成本。
High-rise prefabricated building integral operation platform, construction method and application thereof
一种高层装配式建筑整体作业平台及其施工方法与应用
ZHU LONGFEI (Autor:in) / ZHU AIMIN (Autor:in)
09.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
High-rise fabricated building integral operation platform and construction method thereof
Europäisches Patentamt | 2022
|Integral operation platform for high-rise fabricated building
Europäisches Patentamt | 2022
|Double-layer integral lifting operation platform used for high-rise building construction
Europäisches Patentamt | 2020
|High-rise building prefabricated main beam assembly and construction method thereof
Europäisches Patentamt | 2024
|Prefabricated staircase integral lifting type construction platform and construction method thereof
Europäisches Patentamt | 2021
|