Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building basement waterproof layer construction device and construction method
The invention relates to a building basement waterproof layer construction device, and relates to the field of waterproof construction. The building basement waterproof layer construction device comprises a frame, a front rolling wheel, a coiled material, a guide roller assembly and a lower pressing wheel assembly. The coiled material and the guide roller assembly are arranged on the frame. The front rolling wheel is installed at the front end of the frame, and the lower pressing wheel assembly is arranged at the rear end of the frame, so that the frame can walk. The coiled material is conveyed to the lower pressing wheel assembly through the guide roller assembly and pressed to the ground through the lower pressing wheel assembly. The construction method is carried out through the building basement waterproof layer construction device. The coiled material can be conveniently laid by the building basement waterproof layer construction device and the construction method, and the attaching effect of the coiled material and the ground can be guaranteed, so that the building basement waterproof layer construction device and the construction method have positive significance in improving the laying quality of the coiled material and improving the overall construction efficiency.
一种建筑地下室防水层施工装置,涉及防水施工领域。包括车架、前滚轮、卷材、引导棍组件、下压轮组件。卷材和引导棍组件均设于车架。前滚轮安装于车架的前端,下压轮组件设于车架的后端,以供车架行走。卷材经引导棍组件被输送至下压轮组件,由下压轮组件压向地面。施工方法利用建筑地下室防水层施工装置进行。二者能够很方便地对卷材进行铺设,并且能够保证卷材与地面的贴合效果,对于提升卷材铺设质量、提高整体施工效率具有积极意义。
Building basement waterproof layer construction device and construction method
The invention relates to a building basement waterproof layer construction device, and relates to the field of waterproof construction. The building basement waterproof layer construction device comprises a frame, a front rolling wheel, a coiled material, a guide roller assembly and a lower pressing wheel assembly. The coiled material and the guide roller assembly are arranged on the frame. The front rolling wheel is installed at the front end of the frame, and the lower pressing wheel assembly is arranged at the rear end of the frame, so that the frame can walk. The coiled material is conveyed to the lower pressing wheel assembly through the guide roller assembly and pressed to the ground through the lower pressing wheel assembly. The construction method is carried out through the building basement waterproof layer construction device. The coiled material can be conveniently laid by the building basement waterproof layer construction device and the construction method, and the attaching effect of the coiled material and the ground can be guaranteed, so that the building basement waterproof layer construction device and the construction method have positive significance in improving the laying quality of the coiled material and improving the overall construction efficiency.
一种建筑地下室防水层施工装置,涉及防水施工领域。包括车架、前滚轮、卷材、引导棍组件、下压轮组件。卷材和引导棍组件均设于车架。前滚轮安装于车架的前端,下压轮组件设于车架的后端,以供车架行走。卷材经引导棍组件被输送至下压轮组件,由下压轮组件压向地面。施工方法利用建筑地下室防水层施工装置进行。二者能够很方便地对卷材进行铺设,并且能够保证卷材与地面的贴合效果,对于提升卷材铺设质量、提高整体施工效率具有积极意义。
Building basement waterproof layer construction device and construction method
一种建筑地下室防水层施工装置及施工方法
MAO SHUAI (Autor:in) / HUANG BIAO (Autor:in) / ZHANG DONG (Autor:in) / ZHANG BIN (Autor:in) / ZHANG MINQIANG (Autor:in) / LI ZHENBO (Autor:in) / PAN BAO (Autor:in) / SU QINJIAN (Autor:in) / ZHOU XUETAO (Autor:in) / LI WENFENG (Autor:in)
20.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for building waterproof protection layer of basement
Europäisches Patentamt | 2022
|Basement waterproof layer construction method and structure
Europäisches Patentamt | 2024
|