Floating bollard embedded part mounting construction method
The invention relates to a floating bollard embedded part mounting construction method. The method comprises the following steps of (1) mounting a base support; (2) pouring concrete to a gate wall bottom plate; (3) assembling floating bollard embedded parts; (4) mounting first assembly sections of the floating bollard embedded parts; (5) mounting upper floating bollard embedded parts; (6) performing stand-up form storage; (7) performing concrete pouring; (8) removing inner supports; and (9) performing polishing and anti-corrosion operations on floating bollard embedded part welding points. Through the adoption of the method, the problems that in the prior art, the construction period is long, and other construction operations are influenced, are solved, and the construction efficiency is effectively improved.
一种浮式系船柱埋件安装施工方法,包括以下步骤:1)底座支架安装;2)闸墙底板混凝土浇筑;3)浮式系船柱埋件拼装;4)浮式系船柱埋件首装节安装;5)上部浮式系船柱埋件安装;6)立模备仓;7)混凝土浇筑;8)内支架拆除;9)浮式系船柱埋件焊点打磨、防腐。本发明专利采用上述方法,可有效解决现有技术中施工工期长、影响其他施工作业进行的问题,有效提升施工效率。
Floating bollard embedded part mounting construction method
The invention relates to a floating bollard embedded part mounting construction method. The method comprises the following steps of (1) mounting a base support; (2) pouring concrete to a gate wall bottom plate; (3) assembling floating bollard embedded parts; (4) mounting first assembly sections of the floating bollard embedded parts; (5) mounting upper floating bollard embedded parts; (6) performing stand-up form storage; (7) performing concrete pouring; (8) removing inner supports; and (9) performing polishing and anti-corrosion operations on floating bollard embedded part welding points. Through the adoption of the method, the problems that in the prior art, the construction period is long, and other construction operations are influenced, are solved, and the construction efficiency is effectively improved.
一种浮式系船柱埋件安装施工方法,包括以下步骤:1)底座支架安装;2)闸墙底板混凝土浇筑;3)浮式系船柱埋件拼装;4)浮式系船柱埋件首装节安装;5)上部浮式系船柱埋件安装;6)立模备仓;7)混凝土浇筑;8)内支架拆除;9)浮式系船柱埋件焊点打磨、防腐。本发明专利采用上述方法,可有效解决现有技术中施工工期长、影响其他施工作业进行的问题,有效提升施工效率。
Floating bollard embedded part mounting construction method
浮式系船柱埋件安装施工方法
WANG GUOSHENG (Autor:in) / CHEN GENG (Autor:in) / LIU SUJUN (Autor:in) / LI SIZHUANG (Autor:in) / HUANG LIYA (Autor:in) / LIN QUNMEI (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau