Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Suspended formwork support and construction method thereof
The invention discloses a suspended formwork support. The support comprises angle steel and square pipes, a plurality of pieces of angle steel are installed between the two square pipes, internal expansion bolt preformed holes are formed in the two ends of each square pipe, the square pipes are fixed to a concrete bottom plate through internal expansion bolts and pressing nuts installed at the internal expansion bolt preformed holes, and each piece of angle steel is fixed to the square pipes through adjustable screw rods. By means of the suspended formwork support, the labor intensity of workers can be reduced, the workers can be prevented from frequently using spatula to smear materials upwards and compacting the materials for a long time, the effect is improved by adopting a large-area suspended formwork, and adhesive extrusion for the suspended formwork can be made once; waste caused after the materials fall to the ground is greatly reduced, and the construction cost is reduced; a structural adhesive is extruded by screwing the four pressing nuts upwards, so that the structural adhesive is in a dense state; by adopting a large-area bottom formwork, maintenance joints are reduced; and the repaired beam bottom line is smooth, the joints are in smooth transition, and the overall appearance quality is obviously improved.
本发明公开了一种吊模支架,包括角钢和方管,在两根方管之间安装有若干个角钢,方管的两端设置有内膨胀螺栓预留孔,方管通过内膨胀螺栓预留孔处安装内膨胀螺栓和挤压螺母与混凝土底板固定,每道角钢与方管之间通过可调螺杆固定。采用本发明的吊模支架可降低工人的劳动强度,可以避免工人频繁用抹刀向上涂抹材料并长时间压实材料,通过采用大面积吊模,提高了功效,吊模挤胶一次成型;大大减少材料落地后造成的浪费,降低了施工成本;通过向上旋紧四个挤压螺母来挤压结构胶,使结构胶达到密实状态。通过采用大面积的底模,减少了维修接缝。修复后的梁底线型顺畅,接缝平顺过渡,整体外观质量明显提高。
Suspended formwork support and construction method thereof
The invention discloses a suspended formwork support. The support comprises angle steel and square pipes, a plurality of pieces of angle steel are installed between the two square pipes, internal expansion bolt preformed holes are formed in the two ends of each square pipe, the square pipes are fixed to a concrete bottom plate through internal expansion bolts and pressing nuts installed at the internal expansion bolt preformed holes, and each piece of angle steel is fixed to the square pipes through adjustable screw rods. By means of the suspended formwork support, the labor intensity of workers can be reduced, the workers can be prevented from frequently using spatula to smear materials upwards and compacting the materials for a long time, the effect is improved by adopting a large-area suspended formwork, and adhesive extrusion for the suspended formwork can be made once; waste caused after the materials fall to the ground is greatly reduced, and the construction cost is reduced; a structural adhesive is extruded by screwing the four pressing nuts upwards, so that the structural adhesive is in a dense state; by adopting a large-area bottom formwork, maintenance joints are reduced; and the repaired beam bottom line is smooth, the joints are in smooth transition, and the overall appearance quality is obviously improved.
本发明公开了一种吊模支架,包括角钢和方管,在两根方管之间安装有若干个角钢,方管的两端设置有内膨胀螺栓预留孔,方管通过内膨胀螺栓预留孔处安装内膨胀螺栓和挤压螺母与混凝土底板固定,每道角钢与方管之间通过可调螺杆固定。采用本发明的吊模支架可降低工人的劳动强度,可以避免工人频繁用抹刀向上涂抹材料并长时间压实材料,通过采用大面积吊模,提高了功效,吊模挤胶一次成型;大大减少材料落地后造成的浪费,降低了施工成本;通过向上旋紧四个挤压螺母来挤压结构胶,使结构胶达到密实状态。通过采用大面积的底模,减少了维修接缝。修复后的梁底线型顺畅,接缝平顺过渡,整体外观质量明显提高。
Suspended formwork support and construction method thereof
一种吊模支架及其施工方法
GU JIANDONG (Autor:in) / HUA BAOFENG (Autor:in) / LI XINGXING (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Suspended formwork construction method and construction device thereof
Europäisches Patentamt | 2023
|Beam reinforcing suspended formwork device and construction method thereof
Europäisches Patentamt | 2021
|Suspended formwork unit and suspended formwork combination
Europäisches Patentamt | 2021
|Formwork support of outrigger construction formwork, construction formwork and construction method
Europäisches Patentamt | 2024
|