Suspended formwork construction method and construction device thereof
The invention relates to the technical field of building construction, in particular to a suspended formwork construction method and a construction device.The construction method at least comprises the following steps that S10, firstly, a structural building capable of achieving floor formwork erecting is constructed, and a to-be-poured structure which cannot achieve floor formwork erecting is reserved; s20, on the constructed structural building body, a suspension frame is erected through the supporting bodies, the main beams and the secondary beams, suspension rods are arranged on the secondary beams, and the main ridges are suspended through the action of the suspension rods; and S30, secondary keels are placed on the main ridges, short steel pipes are placed on the main ridges and the secondary keels, and formwork laying is conducted. The suspended formwork construction method has the advantages of being high in applicability, short in construction period, high in construction efficiency and the like.
本发明涉及建筑施工技术领域,具体涉及一种吊模施工方法及其施工装置,施工方法包至少包括以下步骤:S10、先施工可落地支模的结构楼体,预留无法落地支模的拟浇筑结构;S20、在已完成施工的结构楼体上,通过支撑体、主梁和次梁搭设悬吊框架,在次梁上设置吊杆,通过吊杆的作用对主楞进行悬吊;S30、在主楞放置次龙骨,并在主楞和次龙骨上放置短钢管,进行模板铺设。本发明提供的吊模施工方法具有适用性强、施工周期短、施工效率高等优点。
Suspended formwork construction method and construction device thereof
The invention relates to the technical field of building construction, in particular to a suspended formwork construction method and a construction device.The construction method at least comprises the following steps that S10, firstly, a structural building capable of achieving floor formwork erecting is constructed, and a to-be-poured structure which cannot achieve floor formwork erecting is reserved; s20, on the constructed structural building body, a suspension frame is erected through the supporting bodies, the main beams and the secondary beams, suspension rods are arranged on the secondary beams, and the main ridges are suspended through the action of the suspension rods; and S30, secondary keels are placed on the main ridges, short steel pipes are placed on the main ridges and the secondary keels, and formwork laying is conducted. The suspended formwork construction method has the advantages of being high in applicability, short in construction period, high in construction efficiency and the like.
本发明涉及建筑施工技术领域,具体涉及一种吊模施工方法及其施工装置,施工方法包至少包括以下步骤:S10、先施工可落地支模的结构楼体,预留无法落地支模的拟浇筑结构;S20、在已完成施工的结构楼体上,通过支撑体、主梁和次梁搭设悬吊框架,在次梁上设置吊杆,通过吊杆的作用对主楞进行悬吊;S30、在主楞放置次龙骨,并在主楞和次龙骨上放置短钢管,进行模板铺设。本发明提供的吊模施工方法具有适用性强、施工周期短、施工效率高等优点。
Suspended formwork construction method and construction device thereof
一种吊模施工方法及其施工装置
WANG ZHIPENG (Autor:in) / YUE ZHISONG (Autor:in) / HU YUANHANG (Autor:in) / YAN BING (Autor:in) / SHEN WEI (Autor:in) / QU CHAO (Autor:in) / JIANG BINBIN (Autor:in) / FANG SHUAI (Autor:in) / MA JING (Autor:in) / CHEN WENYU (Autor:in)
01.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Suspended formwork support and construction method thereof
Europäisches Patentamt | 2021
|Beam reinforcing suspended formwork device and construction method thereof
Europäisches Patentamt | 2021
|Suspended formwork construction method for seascape trestle
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Construction method of suspended formwork at building joint
Europäisches Patentamt | 2020
|