Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asynchronous hanging basket lower side formwork novel fixing structure
The invention discloses an asynchronous hanging basket lower side formwork novel fixing structure which comprises a formwork system, a corner fixing plate, a main truss, a suspension system, a lower side formwork system and a bottom formwork, the lower side formwork system is formed by combining side formwork bodies and side formwork back ridges, the formwork system is arranged on the bottom end face of an upper side hanging basket, the main truss is arranged on the upper side of the hanging basket, the positions of the main truss and the bottom end face of the formwork system are fixed through an anchoring system, one end of the suspension system sequentially penetrates through the formwork system, the hanging basket and the main truss, and the other end of the suspension system penetrates through the bottom formwork system to fix the position of the hanging basket. According to the asynchronous hanging basket lower side formwork fixing structure, the corner fixing plate is additionally arranged, asynchronous hanging basket lower side formwork transverse supporting lead screws are replaced with the corner fixing plate structure, the asynchronous hanging basket lower side formwork fixing structure is optimized, the number of the lead screws is greatly reduced, the construction cost is saved, the self-locking form during double-lead-screw demolding is achieved, and rapid demolding is facilitated.
本发明公开了一种异步挂篮下侧模新型固定结构,包括模板系统、拐角固定板、主桁架、悬吊系统、下侧模系统和底模模板,所述下侧模系统由侧模模板以及侧模背楞组合而成,所述上侧挂篮的底部端面设置有模板系统,所述挂篮的上侧设置有主桁架,所述主桁架与模板系统的底部端面通过锚固系统进行位置的固定,所述悬吊系统的一端依次穿过模板系统、挂篮以及主桁架,所述悬吊系统的另一端穿过底模系统实现挂篮的位置固定。所述本发明通过增设拐角固定板,将异步挂篮下侧模横撑丝杠替换为拐角固定板结构,来优化异步挂篮下侧模固定结构,由此大大减少丝杠数量,节省施工成本,并且解决双丝杠脱模时自锁形态,便于快速脱模。
Asynchronous hanging basket lower side formwork novel fixing structure
The invention discloses an asynchronous hanging basket lower side formwork novel fixing structure which comprises a formwork system, a corner fixing plate, a main truss, a suspension system, a lower side formwork system and a bottom formwork, the lower side formwork system is formed by combining side formwork bodies and side formwork back ridges, the formwork system is arranged on the bottom end face of an upper side hanging basket, the main truss is arranged on the upper side of the hanging basket, the positions of the main truss and the bottom end face of the formwork system are fixed through an anchoring system, one end of the suspension system sequentially penetrates through the formwork system, the hanging basket and the main truss, and the other end of the suspension system penetrates through the bottom formwork system to fix the position of the hanging basket. According to the asynchronous hanging basket lower side formwork fixing structure, the corner fixing plate is additionally arranged, asynchronous hanging basket lower side formwork transverse supporting lead screws are replaced with the corner fixing plate structure, the asynchronous hanging basket lower side formwork fixing structure is optimized, the number of the lead screws is greatly reduced, the construction cost is saved, the self-locking form during double-lead-screw demolding is achieved, and rapid demolding is facilitated.
本发明公开了一种异步挂篮下侧模新型固定结构,包括模板系统、拐角固定板、主桁架、悬吊系统、下侧模系统和底模模板,所述下侧模系统由侧模模板以及侧模背楞组合而成,所述上侧挂篮的底部端面设置有模板系统,所述挂篮的上侧设置有主桁架,所述主桁架与模板系统的底部端面通过锚固系统进行位置的固定,所述悬吊系统的一端依次穿过模板系统、挂篮以及主桁架,所述悬吊系统的另一端穿过底模系统实现挂篮的位置固定。所述本发明通过增设拐角固定板,将异步挂篮下侧模横撑丝杠替换为拐角固定板结构,来优化异步挂篮下侧模固定结构,由此大大减少丝杠数量,节省施工成本,并且解决双丝杠脱模时自锁形态,便于快速脱模。
Asynchronous hanging basket lower side formwork novel fixing structure
一种异步挂篮下侧模新型固定结构
TIAN YUNPENG (Autor:in)
10.08.2021
Patent
Elektronische Ressource
Chinesisch
Novel asynchronous hanging basket construction structure
Europäisches Patentamt | 2021
|Aqueduct formwork construction hanging basket with balance structure
Europäisches Patentamt | 2024
|