Construction method of water gate engineering staged diversion cofferdam
The invention discloses a construction method of a water gate engineering staged diversion cofferdam. The construction method comprises the following steps that first-stage cofferdams are constructed on the upstream and the downstream of a planned gate site, and accumulated water in the first-stage cofferdams is drained; foundation treatment and foundation pit excavation are carried out in the first-stage cofferdams, and a first-stage lock chamber structure and a first-stage stilling pool structure are constructed; a plurality of positioning pipes are pre-buried in preset positions on a bottom plate of the first-stage stilling pool structure, and the multiple positioning pipes are arranged on the two opposite sides; a second-stage longitudinal cofferdam is constructed; a second-stage transverse cofferdam is constructed, and the transverse cofferdam and the longitudinal cofferdam are connected to form a second-stage cofferdam; the first-stage cofferdams are disassembled, foundation treatment and foundation pit excavation are carried out in the second-stage cofferdam, and a second-stage lock chamber structure and a second-stage stilling pool structure are constructed; and the second-stage cofferdam is disassembled, and a river channel recovers full-section water passing. According to the construction method of the water gate engineering staged diversion cofferdam, construction and disassembly are convenient, and flood draining safety is facilitated.
本发明公开了一种水闸工程分期导流围堰的施工方法,包括以下步骤:在拟建闸址的上、下游施工一期围堰,并排出一期围堰内部的积水;在一期围堰内部进行地基处理、基坑开挖,并施工一期闸室结构及一期消力池结构;在一期消力池结构的底板上的预设位置处预埋多个定位管,多个定位管设置在相对的两侧;施工二期的纵向围堰;施工二期的横向围堰,并使横向围堰与纵向围堰相衔接,形成二期围堰;拆除一期围堰,在二期围堰内部进行地基处理、基坑开挖,并施工二期闸室结构及二期消力池结构;拆除二期围堰,使河道恢复全断面通水。根据本发明的水闸工程分期导流围堰的施工方法,便于施工和拆卸,有利于行洪安全。
Construction method of water gate engineering staged diversion cofferdam
The invention discloses a construction method of a water gate engineering staged diversion cofferdam. The construction method comprises the following steps that first-stage cofferdams are constructed on the upstream and the downstream of a planned gate site, and accumulated water in the first-stage cofferdams is drained; foundation treatment and foundation pit excavation are carried out in the first-stage cofferdams, and a first-stage lock chamber structure and a first-stage stilling pool structure are constructed; a plurality of positioning pipes are pre-buried in preset positions on a bottom plate of the first-stage stilling pool structure, and the multiple positioning pipes are arranged on the two opposite sides; a second-stage longitudinal cofferdam is constructed; a second-stage transverse cofferdam is constructed, and the transverse cofferdam and the longitudinal cofferdam are connected to form a second-stage cofferdam; the first-stage cofferdams are disassembled, foundation treatment and foundation pit excavation are carried out in the second-stage cofferdam, and a second-stage lock chamber structure and a second-stage stilling pool structure are constructed; and the second-stage cofferdam is disassembled, and a river channel recovers full-section water passing. According to the construction method of the water gate engineering staged diversion cofferdam, construction and disassembly are convenient, and flood draining safety is facilitated.
本发明公开了一种水闸工程分期导流围堰的施工方法,包括以下步骤:在拟建闸址的上、下游施工一期围堰,并排出一期围堰内部的积水;在一期围堰内部进行地基处理、基坑开挖,并施工一期闸室结构及一期消力池结构;在一期消力池结构的底板上的预设位置处预埋多个定位管,多个定位管设置在相对的两侧;施工二期的纵向围堰;施工二期的横向围堰,并使横向围堰与纵向围堰相衔接,形成二期围堰;拆除一期围堰,在二期围堰内部进行地基处理、基坑开挖,并施工二期闸室结构及二期消力池结构;拆除二期围堰,使河道恢复全断面通水。根据本发明的水闸工程分期导流围堰的施工方法,便于施工和拆卸,有利于行洪安全。
Construction method of water gate engineering staged diversion cofferdam
水闸工程分期导流围堰的施工方法
ZHANG JIAN (Autor:in) / LIU KAICAO (Autor:in) / LIU SHIKUN (Autor:in) / YANG JIALIN (Autor:in) / ZHANG PENG (Autor:in) / BU YING (Autor:in) / YANG XIAOKANG (Autor:in) / OU SONGSONG (Autor:in)
13.08.2021
Patent
Elektronische Ressource
Chinesisch
Staged diversion cofferdam construction method for rubber dam
Europäisches Patentamt | 2023
|River channel cofferdam diversion construction method
Europäisches Patentamt | 2021
|River channel excavation diversion method and cofferdam structure
Europäisches Patentamt | 2024
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|