Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
House building integral pouring and one-time forming construction technology
The invention discloses a house building integral pouring one-time forming construction technology, and belongs to the technical field of building construction. The house building integral pouring one-time forming construction technology comprises the following steps that S1, firstly construction points are cleaned; and S2, house foundation points are determined according to construction drawing information on a construction drawing. The house building is composed of a foundation pit concrete cushion layer, a concrete wall body and a roof, and the two parts are formed through one-time pouring of concrete and then connected through one-time pouring after being connected through the steel bars, so that the overall structure of the house building is tightly connected, the structure is firm and stable, the service life is long, the house building integral pouring one-time forming construction technology is not prone to being influenced by the natural environment, and the overall construction process is simple; labor division is reasonable and clear in the construction process, and used materials are clear in distribution, the situation that the construction period is delayed due to material deficiency in the construction process is avoided; and meanwhile, corresponding materials are used in the corresponding process, and the situation that unused materials occupy a large amount of space is avoided.
本发明公开了建筑施工技术领域的一种房屋建筑整体浇注一次成型施工工艺,所述房屋建筑整体浇注一次成型施工工艺包括以下步骤:S1:首先对施工点进行清理工作,再根据施工图纸上的施工图信息对房屋地基点进行确定,本发明通过房屋建筑由基坑混凝土垫层和混凝土墙体与屋顶俩部分组成,且俩部分都是通过混凝土一次浇筑而成,再通过钢筋进行连接后一次性浇筑连接,使得房屋建筑整体结构紧密连接,结构坚固稳定使用寿命长,不易受到自然环境的影响,并且整体施工工序简单,且施工过程中分工合理明确,使用材料分配明确,不会导致施工过程中材料缺失延误工期,同时在相应工序使用相应材料,不会使不使用的材料占用大量场地。
House building integral pouring and one-time forming construction technology
The invention discloses a house building integral pouring one-time forming construction technology, and belongs to the technical field of building construction. The house building integral pouring one-time forming construction technology comprises the following steps that S1, firstly construction points are cleaned; and S2, house foundation points are determined according to construction drawing information on a construction drawing. The house building is composed of a foundation pit concrete cushion layer, a concrete wall body and a roof, and the two parts are formed through one-time pouring of concrete and then connected through one-time pouring after being connected through the steel bars, so that the overall structure of the house building is tightly connected, the structure is firm and stable, the service life is long, the house building integral pouring one-time forming construction technology is not prone to being influenced by the natural environment, and the overall construction process is simple; labor division is reasonable and clear in the construction process, and used materials are clear in distribution, the situation that the construction period is delayed due to material deficiency in the construction process is avoided; and meanwhile, corresponding materials are used in the corresponding process, and the situation that unused materials occupy a large amount of space is avoided.
本发明公开了建筑施工技术领域的一种房屋建筑整体浇注一次成型施工工艺,所述房屋建筑整体浇注一次成型施工工艺包括以下步骤:S1:首先对施工点进行清理工作,再根据施工图纸上的施工图信息对房屋地基点进行确定,本发明通过房屋建筑由基坑混凝土垫层和混凝土墙体与屋顶俩部分组成,且俩部分都是通过混凝土一次浇筑而成,再通过钢筋进行连接后一次性浇筑连接,使得房屋建筑整体结构紧密连接,结构坚固稳定使用寿命长,不易受到自然环境的影响,并且整体施工工序简单,且施工过程中分工合理明确,使用材料分配明确,不会导致施工过程中材料缺失延误工期,同时在相应工序使用相应材料,不会使不使用的材料占用大量场地。
House building integral pouring and one-time forming construction technology
一种房屋建筑整体浇注一次成型施工工艺
YANG SHUGANG (Autor:in) / HE BAOJI (Autor:in) / XU GUANGYUN (Autor:in) / WANG JIANCHUN (Autor:in)
17.08.2021
Patent
Elektronische Ressource
Chinesisch
Integral pouring and one-time forming construction process for house building
Europäisches Patentamt | 2022
|Construction method for integrally forming building house through secondary pouring
Europäisches Patentamt | 2023
|Pouring device for house building construction and pouring method thereof
Europäisches Patentamt | 2024
|