Integral pouring construction method for building
The invention discloses an integral pouring construction method for a building. The building construction method comprises the following steps that 1, surveying and setting-out and preparation work are conducted; 2, vertical steel bars are connected; 3, shear wall steel bars are laid; 4, wall surface steel bars are bound; 5, a protective layer cushion block is arranged; 6, a vertical form is arranged; 7, a horizontal form is arranged; 8, horizontal steel bars are bound; 9, concrete pouring is conducted; 10, concrete floor material paving is conducted; 11, concrete curing is conducted; and 12,the forms are dismantled. According to the integral pouring construction method for the building, the situation that slurry leakage is prone to happen at the joint of the forms can be prevented, and losses are reduced; during pouring, the pollution to the surfaces of reinforcing steel bars cannot be caused, and the concrete treatment is facilitated; and the construction quality at a door and window opening can be guaranteed, and it can be guaranteed that the construction quality on the two sides of the door and window opening is consistent.
本发明公开了一种一体化浇筑的建筑房屋施工方法,所述建筑房屋施工方法包括以下几个步骤:步骤一:测量放线及准备工作;步骤二:竖向钢筋连接;步骤三:剪力墙钢筋铺设;步骤四:墙面钢筋绑扎;步骤五:设置保护层垫块;步骤六:竖向模板安装;步骤七:水平模板安装;步骤八:水平钢筋绑扎;步骤九:混凝土浇筑;步骤十:混凝土楼面铺料;步骤十一:混凝土养护;步骤十二:模板拆除。该一体化浇筑的建筑房屋施工方法,可防止模板连接处容易漏浆,减小损失,且在浇筑时,不会造成钢筋表面的污染,便于混凝土的处理,并且能保证门窗洞口处施工的质量,且能保证门窗洞口两侧的施工质量一致。
Integral pouring construction method for building
The invention discloses an integral pouring construction method for a building. The building construction method comprises the following steps that 1, surveying and setting-out and preparation work are conducted; 2, vertical steel bars are connected; 3, shear wall steel bars are laid; 4, wall surface steel bars are bound; 5, a protective layer cushion block is arranged; 6, a vertical form is arranged; 7, a horizontal form is arranged; 8, horizontal steel bars are bound; 9, concrete pouring is conducted; 10, concrete floor material paving is conducted; 11, concrete curing is conducted; and 12,the forms are dismantled. According to the integral pouring construction method for the building, the situation that slurry leakage is prone to happen at the joint of the forms can be prevented, and losses are reduced; during pouring, the pollution to the surfaces of reinforcing steel bars cannot be caused, and the concrete treatment is facilitated; and the construction quality at a door and window opening can be guaranteed, and it can be guaranteed that the construction quality on the two sides of the door and window opening is consistent.
本发明公开了一种一体化浇筑的建筑房屋施工方法,所述建筑房屋施工方法包括以下几个步骤:步骤一:测量放线及准备工作;步骤二:竖向钢筋连接;步骤三:剪力墙钢筋铺设;步骤四:墙面钢筋绑扎;步骤五:设置保护层垫块;步骤六:竖向模板安装;步骤七:水平模板安装;步骤八:水平钢筋绑扎;步骤九:混凝土浇筑;步骤十:混凝土楼面铺料;步骤十一:混凝土养护;步骤十二:模板拆除。该一体化浇筑的建筑房屋施工方法,可防止模板连接处容易漏浆,减小损失,且在浇筑时,不会造成钢筋表面的污染,便于混凝土的处理,并且能保证门窗洞口处施工的质量,且能保证门窗洞口两侧的施工质量一致。
Integral pouring construction method for building
一种一体化浇筑的建筑房屋施工方法
WU FENGYU (Autor:in) / TU FURONG (Autor:in) / WANG QIAN (Autor:in) / XING LINJIE (Autor:in) / ZHU YINGZI (Autor:in) / XIE ZHENGJIN (Autor:in) / ZHU YAOYONG (Autor:in) / HUANG JUN (Autor:in) / ZHENG XIANGFANG (Autor:in) / LIN XIAONA (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
Bridge substructure integral pouring construction method
Europäisches Patentamt | 2024
|Building foundation building pouring construction method
Europäisches Patentamt | 2021
|House building integral pouring and one-time forming construction technology
Europäisches Patentamt | 2021
|Pouring device for house building construction and pouring method thereof
Europäisches Patentamt | 2024
|Integral pouring and one-time forming construction process for house building
Europäisches Patentamt | 2022
|