Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge unloading adjusting device and construction method thereof
The invention discloses a bridge unloading adjusting device and a construction method thereof. The bridge unloading adjusting device comprises two supporting assemblies and an adjusting assembly arranged in the width direction of the supporting assemblies. The supporting assemblies are provided with inclined plates which are arranged in an inclined mode, the inclined plates of the two supporting assemblies are arranged in an up-and-down stacked mode, and the bottom faces and the top faces of the two supporting assemblies which are arranged in the up-and-down mode are horizontally arranged. The adjusting assembly sequentially penetrates through the long side faces of the two supporting assemblies and the stacked inclined plates and connects the two supporting assemblies into a whole. The adjusting assembly can move up and down in the height direction of the long side faces of the supporting assemblies so that the upper supporting assembly and the lower supporting assembly can slide along the inclined plates to adjust the height of the two supporting assemblies stacked up and down, and therefore the two integrally-connected supporting assemblies are unloaded from the height between the top face of a support arranged below the bridge and used for supporting the bridge and the bottom face of the bridge. The adjusting device is convenient to take materials, easy to manufacture, low in manufacturing cost, safe, controllable, capable of guaranteeing the integrity of the bridge and the accuracy of the position and improving the construction efficiency and capable of being repeatedly used.
一种桥梁卸载调节装置及其施工方法,包括:两个支撑组件和沿支撑组件宽度方向设置的调节组件;支撑组件均配设有倾斜设置的斜板,两个支撑组件的斜板上下叠放设置并使两个上下设置的支撑组件的底面和顶面均水平设置;调节组件依次贯穿两个支撑组件的长侧面和叠放设置的斜板并将两个支撑组件连接于一体;调节组件可沿支撑组件的长侧面的高度方向上下移动使上下两个支撑组件沿斜板滑动以调整两个支撑组件上下叠放的高度,从而使一体连接的两个支撑组件从在置于桥梁下方并支撑桥梁的支架的顶面至桥梁底面之间的高度中卸载。本发明调节装置取材便捷,制作简单,制造成本低,安全可控,保证桥梁的完整性和位置的精准度,提高施工效率,亦可重复利用。
Bridge unloading adjusting device and construction method thereof
The invention discloses a bridge unloading adjusting device and a construction method thereof. The bridge unloading adjusting device comprises two supporting assemblies and an adjusting assembly arranged in the width direction of the supporting assemblies. The supporting assemblies are provided with inclined plates which are arranged in an inclined mode, the inclined plates of the two supporting assemblies are arranged in an up-and-down stacked mode, and the bottom faces and the top faces of the two supporting assemblies which are arranged in the up-and-down mode are horizontally arranged. The adjusting assembly sequentially penetrates through the long side faces of the two supporting assemblies and the stacked inclined plates and connects the two supporting assemblies into a whole. The adjusting assembly can move up and down in the height direction of the long side faces of the supporting assemblies so that the upper supporting assembly and the lower supporting assembly can slide along the inclined plates to adjust the height of the two supporting assemblies stacked up and down, and therefore the two integrally-connected supporting assemblies are unloaded from the height between the top face of a support arranged below the bridge and used for supporting the bridge and the bottom face of the bridge. The adjusting device is convenient to take materials, easy to manufacture, low in manufacturing cost, safe, controllable, capable of guaranteeing the integrity of the bridge and the accuracy of the position and improving the construction efficiency and capable of being repeatedly used.
一种桥梁卸载调节装置及其施工方法,包括:两个支撑组件和沿支撑组件宽度方向设置的调节组件;支撑组件均配设有倾斜设置的斜板,两个支撑组件的斜板上下叠放设置并使两个上下设置的支撑组件的底面和顶面均水平设置;调节组件依次贯穿两个支撑组件的长侧面和叠放设置的斜板并将两个支撑组件连接于一体;调节组件可沿支撑组件的长侧面的高度方向上下移动使上下两个支撑组件沿斜板滑动以调整两个支撑组件上下叠放的高度,从而使一体连接的两个支撑组件从在置于桥梁下方并支撑桥梁的支架的顶面至桥梁底面之间的高度中卸载。本发明调节装置取材便捷,制作简单,制造成本低,安全可控,保证桥梁的完整性和位置的精准度,提高施工效率,亦可重复利用。
Bridge unloading adjusting device and construction method thereof
一种桥梁卸载调节装置及其施工方法
HE YANLONG (Autor:in) / WANG XIAOXIA (Autor:in) / LUO RONGFU (Autor:in) / QIU BIN (Autor:in) / DI WENHUI (Autor:in)
24.08.2021
Patent
Elektronische Ressource
Chinesisch
Bridge support adjusting device and construction method thereof
Europäisches Patentamt | 2024
|Bridge support slope adjusting device and construction method thereof
Europäisches Patentamt | 2024
|Bridge deviation adjusting system and construction method thereof
Europäisches Patentamt | 2024
|Bridge supporting and adjusting device for bridge construction
Europäisches Patentamt | 2022
|Bridge supporting and adjusting device for bridge construction
Europäisches Patentamt | 2021
|