Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Limited earth filling tire wall and construction method thereof
The invention relates to a limited earth filling tire wall and a construction method thereof. The limited earth filling tire wall comprises a compacted earth layer arranged on the slope surface of an original slope body, geogrids are arranged in the compacted earth layer at intervals in the height direction of the slope body, the geogrids are arranged in a two-way inflection manner, a medium-coarse sand inverted filter layer is arranged on the face, close to the slope body, of the compacted earth layer, a water drainage plate is arranged in the compacted earth layer, a tire wall body is arranged on the face, away from the slope body, of the compacted earth layer, the tire wall body comprises a plurality of tire parts stacked together and sandy soil filled in the tire parts, a first connecting piece is arranged between every two adjacent tire parts, and a second connecting piece is arranged between every two tire parts on the upper layer and the lower layer. A plurality of reversely-hooked embedded parts for pulling the tire wall body are arranged in the compacted earth layer. The tire wall has the advantages that the stability of a newly built tire wall body can be guaranteed in a steep or limited space, meanwhile, the seepage stability of the original slope body is guaranteed, the functional requirement for energy absorption and dissipation of the tire wall is met, and the effect that the space of a training ground is utilized in a large scale is achieved.
本申请涉及一种有限填土轮胎墙及其施工方法,其包括设置在原坡体坡面的压实土层,压实土层内沿着坡体的高度方向间隔设置有土工格栅,土工格栅双向回折设置,压实土层靠近坡体的一面设置有中粗砂反滤层,压实土层内设置有排水板,压实土层远离坡体的一面设置有轮胎墙体,轮胎墙体包括多个堆叠设置在一起的轮胎部和填充在轮胎部内的砂土,相邻的两轮胎部之间设置有第一连接件,上下层的两轮胎部之间设置有第二连接件,压实土层内设置有若干用于拉住轮胎墙体的反勾预埋件。本申请具有可以在较陡或者有限的空间内,保证新筑轮胎墙体的稳定性,同时保证了原坡体的渗流稳定性,满足了轮胎墙吸纳消能的功能要求,使得训练场空间较大化利用的效果。
Limited earth filling tire wall and construction method thereof
The invention relates to a limited earth filling tire wall and a construction method thereof. The limited earth filling tire wall comprises a compacted earth layer arranged on the slope surface of an original slope body, geogrids are arranged in the compacted earth layer at intervals in the height direction of the slope body, the geogrids are arranged in a two-way inflection manner, a medium-coarse sand inverted filter layer is arranged on the face, close to the slope body, of the compacted earth layer, a water drainage plate is arranged in the compacted earth layer, a tire wall body is arranged on the face, away from the slope body, of the compacted earth layer, the tire wall body comprises a plurality of tire parts stacked together and sandy soil filled in the tire parts, a first connecting piece is arranged between every two adjacent tire parts, and a second connecting piece is arranged between every two tire parts on the upper layer and the lower layer. A plurality of reversely-hooked embedded parts for pulling the tire wall body are arranged in the compacted earth layer. The tire wall has the advantages that the stability of a newly built tire wall body can be guaranteed in a steep or limited space, meanwhile, the seepage stability of the original slope body is guaranteed, the functional requirement for energy absorption and dissipation of the tire wall is met, and the effect that the space of a training ground is utilized in a large scale is achieved.
本申请涉及一种有限填土轮胎墙及其施工方法,其包括设置在原坡体坡面的压实土层,压实土层内沿着坡体的高度方向间隔设置有土工格栅,土工格栅双向回折设置,压实土层靠近坡体的一面设置有中粗砂反滤层,压实土层内设置有排水板,压实土层远离坡体的一面设置有轮胎墙体,轮胎墙体包括多个堆叠设置在一起的轮胎部和填充在轮胎部内的砂土,相邻的两轮胎部之间设置有第一连接件,上下层的两轮胎部之间设置有第二连接件,压实土层内设置有若干用于拉住轮胎墙体的反勾预埋件。本申请具有可以在较陡或者有限的空间内,保证新筑轮胎墙体的稳定性,同时保证了原坡体的渗流稳定性,满足了轮胎墙吸纳消能的功能要求,使得训练场空间较大化利用的效果。
Limited earth filling tire wall and construction method thereof
一种有限填土轮胎墙及其施工方法
WU YANQUAN (Autor:in) / SU WENZHANG (Autor:in) / WANG DONGDONG (Autor:in)
28.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Limited filling retaining wall earth pressure distribution calculation method
Europäisches Patentamt | 2015
|Integral panel limited space reinforced earth retaining wall and construction method thereof
Europäisches Patentamt | 2024
|Reinforced filling wall structure and construction method thereof
Europäisches Patentamt | 2021
|