Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the field of constructional engineering, in particular to a steel-concrete structure of a fabricated green house building. The steel-concrete structure comprises an outer steel pipe, a coaxial inner steel pipe is arranged in the outer steel pipe, a distance is kept between the outer wall of the outer steel pipe and the inner wall of the inner steel pipe, concrete is poured into the inner steel pipe, a distance retainer is connected between the inner steel pipe and the outer steel pipe, a heat conduction metal pipe penetrates through the distance retainer, an electric heating rod is arranged in the heat conduction metal pipe, and a heat preservation material or a heating device is arranged between the outer steel pipe and the inner steel pipe. The double-layer steel pipe structure of the inner steel pipe and the outer steel pipe is adopted, an air heat insulation layer is arranged between the inner steel pipe and the outer steel pipe, a heat preservation material or a heating device can be arranged in the air heat insulation layer, and therefore concrete in the inner steel pipe cannot be frozen; and the use amount of the concrete is greatly reduced, the setting time of the concrete is greatly shortened, and the time for protecting the concrete from being frozen before the concrete is set is shortened, so that the construction cost is reduced.
本申请涉及建筑工程的领域,尤其是涉及一种装配式绿色房屋建筑的钢‑混凝土结构,包括外钢管,外钢管内设有共轴的内钢管,外钢管的外壁与内钢管的内壁保持距离,内钢管中灌注混凝土,所述内钢管与外钢管之间连接有距离保持器,距离保持器中穿设导热金属管,导热金属管内设有电加热棒,外钢管与内钢管之间设置保温材料或加温装置。本申请采用内钢管和外钢管的双层钢管结构,使内钢管与外钢管之间具有空气隔热层,也可在空气隔热层内设置保温材料或加温装置,从而使内钢管中的混凝土不会受冻;大大减少了混凝土的用量,使混凝土凝固时间大大缩短,使混凝土凝固前保护其免于受冻的时间缩短,从而降低施工成本。
The invention relates to the field of constructional engineering, in particular to a steel-concrete structure of a fabricated green house building. The steel-concrete structure comprises an outer steel pipe, a coaxial inner steel pipe is arranged in the outer steel pipe, a distance is kept between the outer wall of the outer steel pipe and the inner wall of the inner steel pipe, concrete is poured into the inner steel pipe, a distance retainer is connected between the inner steel pipe and the outer steel pipe, a heat conduction metal pipe penetrates through the distance retainer, an electric heating rod is arranged in the heat conduction metal pipe, and a heat preservation material or a heating device is arranged between the outer steel pipe and the inner steel pipe. The double-layer steel pipe structure of the inner steel pipe and the outer steel pipe is adopted, an air heat insulation layer is arranged between the inner steel pipe and the outer steel pipe, a heat preservation material or a heating device can be arranged in the air heat insulation layer, and therefore concrete in the inner steel pipe cannot be frozen; and the use amount of the concrete is greatly reduced, the setting time of the concrete is greatly shortened, and the time for protecting the concrete from being frozen before the concrete is set is shortened, so that the construction cost is reduced.
本申请涉及建筑工程的领域,尤其是涉及一种装配式绿色房屋建筑的钢‑混凝土结构,包括外钢管,外钢管内设有共轴的内钢管,外钢管的外壁与内钢管的内壁保持距离,内钢管中灌注混凝土,所述内钢管与外钢管之间连接有距离保持器,距离保持器中穿设导热金属管,导热金属管内设有电加热棒,外钢管与内钢管之间设置保温材料或加温装置。本申请采用内钢管和外钢管的双层钢管结构,使内钢管与外钢管之间具有空气隔热层,也可在空气隔热层内设置保温材料或加温装置,从而使内钢管中的混凝土不会受冻;大大减少了混凝土的用量,使混凝土凝固时间大大缩短,使混凝土凝固前保护其免于受冻的时间缩短,从而降低施工成本。
Steel-concrete structure of fabricated green house building
装配式绿色房屋建筑的钢-混凝土结构
HAN QING (Autor:in)
15.10.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated steel-concrete structure modular camp house building system
Europäisches Patentamt | 2022
|