Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a fabricated wall structure. The fabricated wall structure comprises a first wall plate and a second wall plate, wherein the first wall plate and the second wall plate are arranged adjacently and fixed to a foundation, and a sealing mechanism is arranged between the first wall plate and the second wall plate and used for blocking a gap between the first wall plate and the second wall plate. According to the fabricated wall structure, an existing fabricated wall component is improved, an improved fabricated wall framework can directly avoid an existing sealing mode through foam glue, and therefore the production cost can be reduced, and meanwhile the problem that the filling sealing performance efficiency is low due to artificial subjective factors during foam glue filling can be avoided; and in addition, through foam glue avoiding, the fabricated wall component has the effect of convenient operation during dismounting and mounting, and therefore an improved fabricated wall has higher application prospects.
本发明涉及一种装配式墙体结构,包括一号墙体板件和二号墙体板件,所述一号墙体板件、二号墙体板件相邻设置,且一号墙体板件和二号墙体板件均固定在地基上,所述一号墙体板件和二号墙体板件之间设置有密封机构,密封机构的设置,用于完成一号墙体板件和二号墙体板件之间缝隙的封堵;本发明通过对现有装配式墙体构件进行改进,改进后的装配式墙体构架,可以直接规避现有泡沫胶进行密封的方式,这样既可以降低生产成本,同时,又可以避免在充填泡沫胶时人工主观因素所导致的充填密封性能效率低的问题,并且,泡沫胶的规避也可以使得装配式墙体构件在拆装时,存在方面操作的效果,因此改进后的装配式墙体具有更高的应用前景。
The invention relates to a fabricated wall structure. The fabricated wall structure comprises a first wall plate and a second wall plate, wherein the first wall plate and the second wall plate are arranged adjacently and fixed to a foundation, and a sealing mechanism is arranged between the first wall plate and the second wall plate and used for blocking a gap between the first wall plate and the second wall plate. According to the fabricated wall structure, an existing fabricated wall component is improved, an improved fabricated wall framework can directly avoid an existing sealing mode through foam glue, and therefore the production cost can be reduced, and meanwhile the problem that the filling sealing performance efficiency is low due to artificial subjective factors during foam glue filling can be avoided; and in addition, through foam glue avoiding, the fabricated wall component has the effect of convenient operation during dismounting and mounting, and therefore an improved fabricated wall has higher application prospects.
本发明涉及一种装配式墙体结构,包括一号墙体板件和二号墙体板件,所述一号墙体板件、二号墙体板件相邻设置,且一号墙体板件和二号墙体板件均固定在地基上,所述一号墙体板件和二号墙体板件之间设置有密封机构,密封机构的设置,用于完成一号墙体板件和二号墙体板件之间缝隙的封堵;本发明通过对现有装配式墙体构件进行改进,改进后的装配式墙体构架,可以直接规避现有泡沫胶进行密封的方式,这样既可以降低生产成本,同时,又可以避免在充填泡沫胶时人工主观因素所导致的充填密封性能效率低的问题,并且,泡沫胶的规避也可以使得装配式墙体构件在拆装时,存在方面操作的效果,因此改进后的装配式墙体具有更高的应用前景。
Fabricated wall structure
一种装配式墙体结构
ZENG ZHIQIANG (Autor:in)
19.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS