Terrace construction method capable of controlling elevation and flatness with high precision
The invention discloses a terrace construction method capable of controlling elevation and flatness with high precision. The terrace construction method comprises the following steps: 1) zoning a terrace; 2) conducting surveying and setting out; 3) mounting a distance adjusting rod; (5) mounting a pouring device; (6) pouring concrete; (7) conducting pouring in partitions or among blocks; (8) maintaining; and (9) conducting joint-cutting. The floor is partitioned, the distance adjusting rod convenient to operate is used for conducting elevation positioning and limiting fixing on a sliding rail, automatic pouring and partitioned pouring are conducted through a concrete pouring device arranged on the sliding rail, meanwhile, a post-pouring belt formed after the sliding rail is dismantled has good integrity after pouring, the elevation and flatness of each subarea and block are easy to control, and pouring quality and construction efficiency are high.
本发明公开了一种高精度控制标高及平整度的地坪施工方法,包括以下步骤,1)地坪分区;2)测量放线;3)调距杆安装;5)浇筑装置安装;6)混凝土浇筑;7)分区或分块间浇筑;8)养护;9)切缝。通过对地坪的分区和分块,并采用便于操作的调距杆对滑轨进行标高定位和限位固定,再通过安装在滑轨上的混凝土浇筑装置自动化浇筑,分区分块浇筑,同时在拆除滑轨后形成的后浇带,在浇筑后整体性好,各分区和分块标高及平整度易于控制,浇筑质量以及施工效率高。
Terrace construction method capable of controlling elevation and flatness with high precision
The invention discloses a terrace construction method capable of controlling elevation and flatness with high precision. The terrace construction method comprises the following steps: 1) zoning a terrace; 2) conducting surveying and setting out; 3) mounting a distance adjusting rod; (5) mounting a pouring device; (6) pouring concrete; (7) conducting pouring in partitions or among blocks; (8) maintaining; and (9) conducting joint-cutting. The floor is partitioned, the distance adjusting rod convenient to operate is used for conducting elevation positioning and limiting fixing on a sliding rail, automatic pouring and partitioned pouring are conducted through a concrete pouring device arranged on the sliding rail, meanwhile, a post-pouring belt formed after the sliding rail is dismantled has good integrity after pouring, the elevation and flatness of each subarea and block are easy to control, and pouring quality and construction efficiency are high.
本发明公开了一种高精度控制标高及平整度的地坪施工方法,包括以下步骤,1)地坪分区;2)测量放线;3)调距杆安装;5)浇筑装置安装;6)混凝土浇筑;7)分区或分块间浇筑;8)养护;9)切缝。通过对地坪的分区和分块,并采用便于操作的调距杆对滑轨进行标高定位和限位固定,再通过安装在滑轨上的混凝土浇筑装置自动化浇筑,分区分块浇筑,同时在拆除滑轨后形成的后浇带,在浇筑后整体性好,各分区和分块标高及平整度易于控制,浇筑质量以及施工效率高。
Terrace construction method capable of controlling elevation and flatness with high precision
一种高精度控制标高及平整度的地坪施工方法
LIU YIQUAN (Autor:in) / ZHANG ZENGYU (Autor:in)
22.10.2021
Patent
Elektronische Ressource
Chinesisch
Method for rapidly improving flatness and elevation of large-area concrete terrace
Europäisches Patentamt | 2023
|Device and method for controlling flatness of concrete terrace
Europäisches Patentamt | 2023
|Construction method for controlling flatness and crack prevention of ultra-large-area terrace
Europäisches Patentamt | 2023
|Method for controlling construction flatness of ultra-large-area carborundum wear-resistant terrace
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|