Fabricated foundation pit, rail weighbridge foundation and monolithic track bed construction method
The invention discloses a fabricated foundation pit, rail weighbridge foundation and monolithic track bed construction method, relates to the technical field of railway metering equipment construction, and solves a problem of long installation and construction time. The construction method comprises the following steps of prefabricating a rail weighbridge foundation, prefabricating a monolithic roadbed slab, and excavating a foundation pit for mounting a corresponding rail weighbridge foundation pit and the monolithic roadbed slab; hoisting a prefabricated rail weighbridge foundation pit into the foundation pit, and hoisting the integral roadbed slab into the foundation pit; and the foundation pit being backfilled and tamped. The construction method is used for arranging the rail weighbridge on the railway line.
一种装配式基坑、轨道衡基础及整体道床施工方法,涉及铁路计量设备施工技术领域,解决了安装施工时间较长的问题。该施工方法包括预制轨道衡基础、预制整体道床板、并开挖出用于安装相应轨道衡基坑及整体道床板的基坑;将预制的轨道衡基坑吊装到基坑内,并将整体道床板吊至基坑内;对基坑进行回填夯实。本申请的施工方法用于在铁路线路上设置轨道衡。
Fabricated foundation pit, rail weighbridge foundation and monolithic track bed construction method
The invention discloses a fabricated foundation pit, rail weighbridge foundation and monolithic track bed construction method, relates to the technical field of railway metering equipment construction, and solves a problem of long installation and construction time. The construction method comprises the following steps of prefabricating a rail weighbridge foundation, prefabricating a monolithic roadbed slab, and excavating a foundation pit for mounting a corresponding rail weighbridge foundation pit and the monolithic roadbed slab; hoisting a prefabricated rail weighbridge foundation pit into the foundation pit, and hoisting the integral roadbed slab into the foundation pit; and the foundation pit being backfilled and tamped. The construction method is used for arranging the rail weighbridge on the railway line.
一种装配式基坑、轨道衡基础及整体道床施工方法,涉及铁路计量设备施工技术领域,解决了安装施工时间较长的问题。该施工方法包括预制轨道衡基础、预制整体道床板、并开挖出用于安装相应轨道衡基坑及整体道床板的基坑;将预制的轨道衡基坑吊装到基坑内,并将整体道床板吊至基坑内;对基坑进行回填夯实。本申请的施工方法用于在铁路线路上设置轨道衡。
Fabricated foundation pit, rail weighbridge foundation and monolithic track bed construction method
一种装配式基坑、轨道衡基础及整体道床施工方法
ZHANG XIHONG (Autor:in) / CHEN GENG (Autor:in) / LYU JINGTAO (Autor:in) / LIU JINCHUN (Autor:in) / LI HONGZHOU (Autor:in) / LYU LING (Autor:in) / GAO YAN (Autor:in)
26.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
CONSTRUCTION METHOD OF RAIL FOUNDATION AND RAIL FOUNDATION BLOCK
Europäisches Patentamt | 2020
|Geotextiles in Rail Track Foundation
British Library Conference Proceedings | 1991
|Fabricated bridge type gantry track foundation and construction method thereof
Europäisches Patentamt | 2024
|Fabricated pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2022
|