Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of pile foundation construction, in particular to a reinforced concrete anti-seismic bridge pile foundation. The reinforced concrete anti-seismic bridge pile foundation comprises a first pile column, a second pile column is poured on the side end face of the first pile column, the upper end face of the first pile column is fixedly connected to one end of a fixing column, the side end face of the fixing column is fixedly connected to a base table, the upper end face of the base table is fixedly connected to a connecting column, and the upper end face of the first pile column is fixedly connected to one end of a supporting spring. The invention further discloses a construction method of the reinforced concrete anti-seismic bridge pile foundation, and the construction method is used for constructing the pile foundation and comprises the steps that the position where the pile foundation needs to be built is selected, then the ground is leveled, and then a preparation pit with the depth being 1 meter is tamped in a pile foundation construction point through an earth rammer; and a pile foundation pit matched with the pile foundation is drilled in the preparation pit, and meanwhile, reinforcement cages of the first pile column and the second pile column are assembled. The service life of the pile foundation is effectively prolonged, and meanwhile the pile foundation has good shock resistance.
本发明涉及桩基施工技术领域,具体地说,涉及一种钢筋混凝土抗震桥梁桩基,包括第一桩柱,所述第一桩柱侧端面浇筑有第二桩柱,所述第一桩柱上端面固定连接有固定柱的一端,所述固定柱侧端面固定连接有基台,所述基台上端面固定连接有连接柱,所述第一桩柱上端面固定连接有支撑弹簧的一端。还包括一种钢筋混凝土抗震桥梁桩基的施工方法,用于施工上述桩基,包括选择需要建立桩基的位置,将地面平整,然后使用夯土机将桩基施工点夯出一个深度为1m的预备坑;在预备坑内钻出与桩基适配的桩基坑,同时组装第一桩柱和第二桩柱的钢筋笼。该发明有效提高了桩基的使用寿命,同时该桩基具有良好的抗震能力。
The invention relates to the technical field of pile foundation construction, in particular to a reinforced concrete anti-seismic bridge pile foundation. The reinforced concrete anti-seismic bridge pile foundation comprises a first pile column, a second pile column is poured on the side end face of the first pile column, the upper end face of the first pile column is fixedly connected to one end of a fixing column, the side end face of the fixing column is fixedly connected to a base table, the upper end face of the base table is fixedly connected to a connecting column, and the upper end face of the first pile column is fixedly connected to one end of a supporting spring. The invention further discloses a construction method of the reinforced concrete anti-seismic bridge pile foundation, and the construction method is used for constructing the pile foundation and comprises the steps that the position where the pile foundation needs to be built is selected, then the ground is leveled, and then a preparation pit with the depth being 1 meter is tamped in a pile foundation construction point through an earth rammer; and a pile foundation pit matched with the pile foundation is drilled in the preparation pit, and meanwhile, reinforcement cages of the first pile column and the second pile column are assembled. The service life of the pile foundation is effectively prolonged, and meanwhile the pile foundation has good shock resistance.
本发明涉及桩基施工技术领域,具体地说,涉及一种钢筋混凝土抗震桥梁桩基,包括第一桩柱,所述第一桩柱侧端面浇筑有第二桩柱,所述第一桩柱上端面固定连接有固定柱的一端,所述固定柱侧端面固定连接有基台,所述基台上端面固定连接有连接柱,所述第一桩柱上端面固定连接有支撑弹簧的一端。还包括一种钢筋混凝土抗震桥梁桩基的施工方法,用于施工上述桩基,包括选择需要建立桩基的位置,将地面平整,然后使用夯土机将桩基施工点夯出一个深度为1m的预备坑;在预备坑内钻出与桩基适配的桩基坑,同时组装第一桩柱和第二桩柱的钢筋笼。该发明有效提高了桩基的使用寿命,同时该桩基具有良好的抗震能力。
Reinforced concrete anti-seismic bridge pile foundation and pile foundation construction method
一种钢筋混凝土抗震桥梁桩基及桩基施工方法
QIN WEI (Autor:in)
09.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anti-seismic bridge pile foundation and pile foundation construction method
Europäisches Patentamt | 2022
|Effective anti-seismic pile foundation for bridge construction
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2015
|