Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of butt joint assemblies, in particular to a steel structure pre-installation butt joint assembly. The steel structure pre-installation butt joint assembly comprises a first bottom plate and a locking mechanism, the locking mechanism is arranged on the first bottom plate, and a supporting mechanism is arranged below the first bottom plate; and the locking mechanism comprises a bidirectional threaded rod, the bidirectional threaded rod is movably connected to one side of the interior of the first bottom plate through a bearing, sliding blocks are connected to the two sides of the exterior of the bidirectional threaded rod through threads, sliding grooves matched with the two sliding blocks are formed in the first bottom plate, and clamping plates are fixedly connected to one ends of the sliding blocks. The steel structure pre-installation butt joint assembly can automatically complete centering in the clamping process, so that during installation, auxiliary channel steel cannot deviate, installation is more convenient and faster, the steel structure pre-installation butt joint assembly can drive the auxiliary channel steel to move to be in butt joint with main channel steel, the auxiliary channel steel is pre-installed, and operation is easy, convenient and fast.
本发明涉及对接组件技术领域,具体为一种钢结构预安装对接组件,一种钢结构预安装对接组件,包括第一底板,所述第一底板上设置于有锁定机构,且第一底板下方设置有支撑机构,锁定机构,包括双向螺纹杆,所述第一底板内部一侧通过轴承活动连接有双向螺纹杆,且双向螺纹杆外部两侧通过螺纹连接有滑动块,且第一底板内部开设有与两组滑动块相互配合的滑槽,所述滑动块的一端上固定连接有夹板。本发明带来了装置在夹紧的过程中可自动完成对中心,从而使得安装时,辅助槽钢不会发生偏移,使得安装时更加便捷,并且装置可带动辅助槽钢运动与主槽钢完成对接,从而使得辅助槽钢完成预安装,操作简单便捷。
The invention relates to the technical field of butt joint assemblies, in particular to a steel structure pre-installation butt joint assembly. The steel structure pre-installation butt joint assembly comprises a first bottom plate and a locking mechanism, the locking mechanism is arranged on the first bottom plate, and a supporting mechanism is arranged below the first bottom plate; and the locking mechanism comprises a bidirectional threaded rod, the bidirectional threaded rod is movably connected to one side of the interior of the first bottom plate through a bearing, sliding blocks are connected to the two sides of the exterior of the bidirectional threaded rod through threads, sliding grooves matched with the two sliding blocks are formed in the first bottom plate, and clamping plates are fixedly connected to one ends of the sliding blocks. The steel structure pre-installation butt joint assembly can automatically complete centering in the clamping process, so that during installation, auxiliary channel steel cannot deviate, installation is more convenient and faster, the steel structure pre-installation butt joint assembly can drive the auxiliary channel steel to move to be in butt joint with main channel steel, the auxiliary channel steel is pre-installed, and operation is easy, convenient and fast.
本发明涉及对接组件技术领域,具体为一种钢结构预安装对接组件,一种钢结构预安装对接组件,包括第一底板,所述第一底板上设置于有锁定机构,且第一底板下方设置有支撑机构,锁定机构,包括双向螺纹杆,所述第一底板内部一侧通过轴承活动连接有双向螺纹杆,且双向螺纹杆外部两侧通过螺纹连接有滑动块,且第一底板内部开设有与两组滑动块相互配合的滑槽,所述滑动块的一端上固定连接有夹板。本发明带来了装置在夹紧的过程中可自动完成对中心,从而使得安装时,辅助槽钢不会发生偏移,使得安装时更加便捷,并且装置可带动辅助槽钢运动与主槽钢完成对接,从而使得辅助槽钢完成预安装,操作简单便捷。
Auxiliary device for steel structure butt joint installation
Europäisches Patentamt | 2023
|Large-diameter steel casing structure and butt joint installation method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Steel structure butt joint device and butt joint method for steel structure construction
Europäisches Patentamt | 2024
|Installation method for butt joint of inclined steel columns
Europäisches Patentamt | 2023
|