Bottom die structure and floor slab pouring construction method
The invention relates to a bottom die structure and a floor slab pouring construction method, and belongs to the field of building construction. The bottom die structure comprises a supporting beam and a supporting assembly arranged on one side of the supporting beam, the supporting beam is provided with an upper flange, the supporting assembly is provided with a height-adjustable supporting end, a bottom die is laid on the supporting end and located below the upper flange, a first steel bar group is laid on the upper flange, a second steel bar group is laid on the bottom die, and the bundling thickness of the first steel bar group is the same as that of the second steel bar group, so that the pouring height corresponding to the bottom die and the upper flange forms a fall. According to the bottom die structure, the pouring requirements of floor slabs with different height differences can be met, meanwhile, the mounting and dismounting work of a floor slab supporting system is facilitated, and the working efficiency is improved.
本发明涉及一种底模结构及楼板浇筑施工方法,属于建筑施工领域,其中,底模结构包括支撑梁及设于支撑梁一侧的支撑组件,支撑梁具有上翼缘,支撑组件具有高度可调的支撑端,底模铺设于支撑端上并位于上翼缘下方,在上翼缘上铺设第一钢筋组,并在底模上铺设第二钢筋组,第一钢筋组和第二钢筋组的捆扎厚度相同,以使底模和上翼缘对应的浇筑高度形成落差。本发明提供的底模结构,有利于满足不同高低落差的楼板浇筑需求,同时,有利于进行楼板支撑体系的安装和拆除工作,提升工作效率。
Bottom die structure and floor slab pouring construction method
The invention relates to a bottom die structure and a floor slab pouring construction method, and belongs to the field of building construction. The bottom die structure comprises a supporting beam and a supporting assembly arranged on one side of the supporting beam, the supporting beam is provided with an upper flange, the supporting assembly is provided with a height-adjustable supporting end, a bottom die is laid on the supporting end and located below the upper flange, a first steel bar group is laid on the upper flange, a second steel bar group is laid on the bottom die, and the bundling thickness of the first steel bar group is the same as that of the second steel bar group, so that the pouring height corresponding to the bottom die and the upper flange forms a fall. According to the bottom die structure, the pouring requirements of floor slabs with different height differences can be met, meanwhile, the mounting and dismounting work of a floor slab supporting system is facilitated, and the working efficiency is improved.
本发明涉及一种底模结构及楼板浇筑施工方法,属于建筑施工领域,其中,底模结构包括支撑梁及设于支撑梁一侧的支撑组件,支撑梁具有上翼缘,支撑组件具有高度可调的支撑端,底模铺设于支撑端上并位于上翼缘下方,在上翼缘上铺设第一钢筋组,并在底模上铺设第二钢筋组,第一钢筋组和第二钢筋组的捆扎厚度相同,以使底模和上翼缘对应的浇筑高度形成落差。本发明提供的底模结构,有利于满足不同高低落差的楼板浇筑需求,同时,有利于进行楼板支撑体系的安装和拆除工作,提升工作效率。
Bottom die structure and floor slab pouring construction method
一种底模结构及楼板浇筑施工方法
HE HONG (Autor:in) / CHEN TAO (Autor:in) / ZHOU LEI (Autor:in) / ZHANG YU (Autor:in) / JI ZEHUA (Autor:in) / HUANG HANGBIN (Autor:in) / HAO YINSEN (Autor:in) / WANG XIAOMING (Autor:in) / HONG XIAOLONG (Autor:in)
16.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor slab supporting device and floor slab pouring method
Europäisches Patentamt | 2023
|Device for pouring floor slab and floor slab formed by pouring same
Europäisches Patentamt | 2024
|Floor slab post-cast strip pouring assembly and floor slab pouring method adopting same
Europäisches Patentamt | 2021
|Reserved hole construction method for concrete pouring floor slab
Europäisches Patentamt | 2023
|