Asphalt highway construction method
The invention discloses an asphalt highway construction method, and relates to the field of road construction. The method comprises the following steps: firstly, carrying out construction preparation work, sweeping a pavement base layer of a construction site, removing sundries on the pavement base layer, repairing pit slots in the pavement base layer, and stirring asphalt mixture raw materials while sweeping the pavement base layer so as to produce an asphalt mixture, and after mixing is completed, transporting the asphalt mixture to a construction site through an asphalt mixture transport vehicle. The construction process comprises the following steps: mixing an asphalt mixture, pressing indentations on a pavement base layer, paving a gravel layer, paving a sand-gravel layer, paving a waterproof glue layer, paving the asphalt mixture, rolling the asphalt mixture, and treating road joints and road edges. The multifunctional road roller can be changed into a steel wheel road roller, a pneumatic tire road roller and an indentation road roller, the conditions of bulge and fragmentation of the asphalt road caused by accumulated water under the pavement base layer are effectively prevented, and the service life of the asphalt road is prolonged.
本发明公开了一种沥青公路施工方法,涉及道路施工领域,包括以下步骤:首先进行施工准备工作,对施工现场的路面基层进行清扫,清除路面基层上的杂物并且修复路面基层上的坑槽,清扫路面基层的同时,对沥青混合料原材料进行搅拌,从而产生沥青混合料,在混合完成后,使用沥青混合料运输车将沥青混合料运输至施工地点。本发明施工流程为:拌沥青混合料、在路面基层压出压痕、碎石层铺设、砂石层铺设、防水胶层铺设、沥青混合料摊铺、沥青混合料碾压、道路接缝与道路边缘处理,多功能压路机可更改为钢轮压路机、轮胎压路机与压痕压路机,有效防止由于路面基层下积水造成沥青公路鼓包、碎裂的情况,增加沥青道路的使用寿命。
Asphalt highway construction method
The invention discloses an asphalt highway construction method, and relates to the field of road construction. The method comprises the following steps: firstly, carrying out construction preparation work, sweeping a pavement base layer of a construction site, removing sundries on the pavement base layer, repairing pit slots in the pavement base layer, and stirring asphalt mixture raw materials while sweeping the pavement base layer so as to produce an asphalt mixture, and after mixing is completed, transporting the asphalt mixture to a construction site through an asphalt mixture transport vehicle. The construction process comprises the following steps: mixing an asphalt mixture, pressing indentations on a pavement base layer, paving a gravel layer, paving a sand-gravel layer, paving a waterproof glue layer, paving the asphalt mixture, rolling the asphalt mixture, and treating road joints and road edges. The multifunctional road roller can be changed into a steel wheel road roller, a pneumatic tire road roller and an indentation road roller, the conditions of bulge and fragmentation of the asphalt road caused by accumulated water under the pavement base layer are effectively prevented, and the service life of the asphalt road is prolonged.
本发明公开了一种沥青公路施工方法,涉及道路施工领域,包括以下步骤:首先进行施工准备工作,对施工现场的路面基层进行清扫,清除路面基层上的杂物并且修复路面基层上的坑槽,清扫路面基层的同时,对沥青混合料原材料进行搅拌,从而产生沥青混合料,在混合完成后,使用沥青混合料运输车将沥青混合料运输至施工地点。本发明施工流程为:拌沥青混合料、在路面基层压出压痕、碎石层铺设、砂石层铺设、防水胶层铺设、沥青混合料摊铺、沥青混合料碾压、道路接缝与道路边缘处理,多功能压路机可更改为钢轮压路机、轮胎压路机与压痕压路机,有效防止由于路面基层下积水造成沥青公路鼓包、碎裂的情况,增加沥青道路的使用寿命。
Asphalt highway construction method
沥青公路施工方法