Construction method of precast concrete anti-skid board with drainage system
The invention relates to a construction method of a precast concrete anti-skid board with a drainage system. The construction method comprises the following steps of binding reinforcing steel bars according to drawing reinforcement, reserving positions of cast iron pipes, and penetrating the cast iron pipes into the reinforcing steel bars; and after reinforcing steel bars 5 are bound, a prefabricated slab surface model is manufactured, the model is a universal model, and the reinforced steel bars can be integrally placed in the model; reinforcing steel bar cushion blocks are arranged at the bottom so that enough reinforcing steel bar protection layers are provided; and after all work is completed, concrete pouring is conducted. The method is advantaged in that environment pollution and resource waste caused by construction waste formed by road crushing and clearing after field hardening can be avoided, and cost is saved; paving is simple, reutilization can be achieved, and the early-stage tee joint one-level construction progress of a construction site can be greatly accelerated.
本发明涉及一种自带排水系统的预制混凝土防滑板面施工方法,按照图纸配筋进行钢筋绑扎,预留出铸铁管位置,将铸铁管穿入钢筋内部。待钢筋5绑扎完毕后,制作预制板面模型,此模型为通用模型,可将钢筋整体放入模型内。底部防止钢筋垫块,使其有足够的钢筋保护层。待一切工作完毕后进行混凝土浇筑。本发明可避免现场硬化后道路破碎清除形成建筑垃圾造成环境污染,资源浪费,节约成本;铺装简单,可重复利用,可大大加快施工现场前期施工三通一平施工进度。
Construction method of precast concrete anti-skid board with drainage system
The invention relates to a construction method of a precast concrete anti-skid board with a drainage system. The construction method comprises the following steps of binding reinforcing steel bars according to drawing reinforcement, reserving positions of cast iron pipes, and penetrating the cast iron pipes into the reinforcing steel bars; and after reinforcing steel bars 5 are bound, a prefabricated slab surface model is manufactured, the model is a universal model, and the reinforced steel bars can be integrally placed in the model; reinforcing steel bar cushion blocks are arranged at the bottom so that enough reinforcing steel bar protection layers are provided; and after all work is completed, concrete pouring is conducted. The method is advantaged in that environment pollution and resource waste caused by construction waste formed by road crushing and clearing after field hardening can be avoided, and cost is saved; paving is simple, reutilization can be achieved, and the early-stage tee joint one-level construction progress of a construction site can be greatly accelerated.
本发明涉及一种自带排水系统的预制混凝土防滑板面施工方法,按照图纸配筋进行钢筋绑扎,预留出铸铁管位置,将铸铁管穿入钢筋内部。待钢筋5绑扎完毕后,制作预制板面模型,此模型为通用模型,可将钢筋整体放入模型内。底部防止钢筋垫块,使其有足够的钢筋保护层。待一切工作完毕后进行混凝土浇筑。本发明可避免现场硬化后道路破碎清除形成建筑垃圾造成环境污染,资源浪费,节约成本;铺装简单,可重复利用,可大大加快施工现场前期施工三通一平施工进度。
Construction method of precast concrete anti-skid board with drainage system
自带排水系统的预制混凝土防滑板面施工方法
LI ZHILEI (Autor:in) / YU HUIMING (Autor:in) / WEN QINGWEI (Autor:in) / MA TENGFEI (Autor:in)
19.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
Construction method of concrete pavement anti-skid structure
Europäisches Patentamt | 2023
|Anti-clogging drainage precast pile and construction method thereof
Europäisches Patentamt | 2021
|PRECAST CONCRETE STRUCTURE AND PRECAST CONCRETE CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|Preparation and construction method of embedded self-drainage anti-skid marking line
Europäisches Patentamt | 2023
|