Double-steel-pipe concrete joint of externally-wrapped composite winding pipe and preparation method of double-steel-pipe concrete joint
The invention relates to a double-steel-pipe concrete joint of an externally-wrapped composite winding pipe, and belongs to the technical field of building structures. The double-steel-pipe concrete joint comprises a main part and at least one auxiliary part, the structure of the main part is the same as that of the auxiliary part, and each of the main part and the auxiliary part comprises a composite winding pipe layer, an outer steel pipe layer, a concrete layer and an inner steel pipe layer which are sequentially arranged from outside to inside; the concrete layer is arranged between the inner steel pipe layer and the outer steel pipe layer in a pouring mode; a plurality of connecting parts are arranged between the outer steel pipe layer and the inner steel pipe layer, and the inner steel pipe layer and the outer steel pipe layer are fixedly connected through the connecting parts to form a double-steel-pipe section; and the double-steel-pipe section of the auxiliary part is fixedly connected with the outer side wall of the outer steel pipe of the double-steel-pipe section of the main part. The invention further relates to a preparation method of the double-steel-pipe concrete joint of the externally-wrapped composite winding pipe. The double-steel-pipe concrete joint of the externally-wrapped composite winding pipe is convenient to splice, simple in construction process and easy to process and manufacture.
本发明涉及一种外包复材缠绕管双钢管混凝土节点,包括主构件、至少一个副构件,主构件的结构与副构件的结构相同,均包括从外向内依次设置的复材缠绕管层、外钢管层、混凝土层和内钢管层;混凝土层通过浇筑的形式设置在内钢管层和外钢管层之间;外钢管层和内钢管层之间设置有多个连接部件,连接部件将内钢管层和外钢管层固定连接形成双钢管节段;副构件的双钢管节段与主构件的双钢管节段外钢管外侧壁固定连接。本发明还涉及一种外包复材缠绕管双钢管混凝土节点的制备方法。本发明拼接方便,施工工艺简单,易于加工制造,属于建筑结构技术领域。
Double-steel-pipe concrete joint of externally-wrapped composite winding pipe and preparation method of double-steel-pipe concrete joint
The invention relates to a double-steel-pipe concrete joint of an externally-wrapped composite winding pipe, and belongs to the technical field of building structures. The double-steel-pipe concrete joint comprises a main part and at least one auxiliary part, the structure of the main part is the same as that of the auxiliary part, and each of the main part and the auxiliary part comprises a composite winding pipe layer, an outer steel pipe layer, a concrete layer and an inner steel pipe layer which are sequentially arranged from outside to inside; the concrete layer is arranged between the inner steel pipe layer and the outer steel pipe layer in a pouring mode; a plurality of connecting parts are arranged between the outer steel pipe layer and the inner steel pipe layer, and the inner steel pipe layer and the outer steel pipe layer are fixedly connected through the connecting parts to form a double-steel-pipe section; and the double-steel-pipe section of the auxiliary part is fixedly connected with the outer side wall of the outer steel pipe of the double-steel-pipe section of the main part. The invention further relates to a preparation method of the double-steel-pipe concrete joint of the externally-wrapped composite winding pipe. The double-steel-pipe concrete joint of the externally-wrapped composite winding pipe is convenient to splice, simple in construction process and easy to process and manufacture.
本发明涉及一种外包复材缠绕管双钢管混凝土节点,包括主构件、至少一个副构件,主构件的结构与副构件的结构相同,均包括从外向内依次设置的复材缠绕管层、外钢管层、混凝土层和内钢管层;混凝土层通过浇筑的形式设置在内钢管层和外钢管层之间;外钢管层和内钢管层之间设置有多个连接部件,连接部件将内钢管层和外钢管层固定连接形成双钢管节段;副构件的双钢管节段与主构件的双钢管节段外钢管外侧壁固定连接。本发明还涉及一种外包复材缠绕管双钢管混凝土节点的制备方法。本发明拼接方便,施工工艺简单,易于加工制造,属于建筑结构技术领域。
Double-steel-pipe concrete joint of externally-wrapped composite winding pipe and preparation method of double-steel-pipe concrete joint
一种外包复材缠绕管双钢管混凝土节点及其制备方法
CHEN GUANGMING (Autor:in) / LU YICHEN (Autor:in) / LIN ZUOHONG (Autor:in) / GUO YUANZE (Autor:in) / LI ZHAOBING (Autor:in) / HU FUNAN (Autor:in) / LIU WEINAN (Autor:in)
19.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Construction method of outer wrapped concrete steel pipe composite column
Europäisches Patentamt | 2015
|Concrete-wrapped steel pipe concrete combination column and construction method