The invention discloses a composite discharging platform and a construction method thereof, and relates to the technical field of vertical transportation of equipment. The problems that an existing discharging platform is extensive in positioning, inconvenient to transport materials and large in potential safety hazard are solved. The composite discharging platform comprises a main platform, a movable platform and an auxiliary platform, the main platform comprises a base, a guardrail vertically surrounding the edge of the base and a safety door, the movable platform is arranged in the main platform after bearing materials, and after the main platform and the movable platform are hoisted to the designated position, the main platform is detachably connected with the auxiliary platform fixed to the edge of a floorslab, and the movable platform can enter and exit the current floor through the safety door and transport materials. The construction method comprises the steps that the auxiliary platform is installed on the edge of the floorslab, the movable platform loaded with materials is driven to the main platform to be locked and fixed, the main platform and the movable platform are hoisted so that the main platform can be detachably connected to the auxiliary platform, finally, the movable platform after discharging is driven into the main platform to be locked, connection between the main platform and the auxiliary platform is loosened, and the main platform and the movable platform are hoisted to the ground.
本发明的复合卸料平台及其施工方法,涉及设备垂直运输技术领域。针对现有卸料平台定位粗放、物料运输不便及安全隐患大的问题。它包括主平台,移动平台和副平台,主平台包括底座,竖向围合于底座边缘的护栏和安全门,移动平台承载物料后置于主平台内,吊装主平台和移动平台至指定位置后,主平台与固定于楼板边缘的副平台可拆卸式连接,使得移动平台能够通过安全门进出当前楼层并运输物料。施工方法:将副平台安装至楼板边缘,驱动载有物料的移动平台至主平台并锁紧固定,吊装主平台和移动平台,使得主平台可拆卸式连接于副平台,最后,驱动卸料后的移动平台至主平台内并锁定,松开主、副平台之间的连接,将主平台及移动平台吊装至地面。
Composite discharging platform and construction method thereof
The invention discloses a composite discharging platform and a construction method thereof, and relates to the technical field of vertical transportation of equipment. The problems that an existing discharging platform is extensive in positioning, inconvenient to transport materials and large in potential safety hazard are solved. The composite discharging platform comprises a main platform, a movable platform and an auxiliary platform, the main platform comprises a base, a guardrail vertically surrounding the edge of the base and a safety door, the movable platform is arranged in the main platform after bearing materials, and after the main platform and the movable platform are hoisted to the designated position, the main platform is detachably connected with the auxiliary platform fixed to the edge of a floorslab, and the movable platform can enter and exit the current floor through the safety door and transport materials. The construction method comprises the steps that the auxiliary platform is installed on the edge of the floorslab, the movable platform loaded with materials is driven to the main platform to be locked and fixed, the main platform and the movable platform are hoisted so that the main platform can be detachably connected to the auxiliary platform, finally, the movable platform after discharging is driven into the main platform to be locked, connection between the main platform and the auxiliary platform is loosened, and the main platform and the movable platform are hoisted to the ground.
本发明的复合卸料平台及其施工方法,涉及设备垂直运输技术领域。针对现有卸料平台定位粗放、物料运输不便及安全隐患大的问题。它包括主平台,移动平台和副平台,主平台包括底座,竖向围合于底座边缘的护栏和安全门,移动平台承载物料后置于主平台内,吊装主平台和移动平台至指定位置后,主平台与固定于楼板边缘的副平台可拆卸式连接,使得移动平台能够通过安全门进出当前楼层并运输物料。施工方法:将副平台安装至楼板边缘,驱动载有物料的移动平台至主平台并锁紧固定,吊装主平台和移动平台,使得主平台可拆卸式连接于副平台,最后,驱动卸料后的移动平台至主平台内并锁定,松开主、副平台之间的连接,将主平台及移动平台吊装至地面。
Composite discharging platform and construction method thereof
复合卸料平台及其施工方法
FANG TINGCHEN (Autor:in) / WU LIANDING (Autor:in) / ZHAO YIMING (Autor:in) / YANG JIALIN (Autor:in)
07.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
House building construction discharging platform and construction method thereof
Europäisches Patentamt | 2023
|House building construction discharging platform and method thereof
Europäisches Patentamt | 2023
|Novel overhanging discharging platform and construction method thereof
Europäisches Patentamt | 2024
|Novel overhanging discharging platform and construction method thereof
Europäisches Patentamt | 2022
|