Cofferdam construction method under complex terrain condition
The invention relates to the field of cofferdam construction, in particular to a cofferdam construction method under complex terrain conditions. Comprising the steps of reinforced gabion machining, riprapping, silt squeezing and leveling, bottom plate construction, first-layer reinforced gabion placement, first laminated plate construction, second-layer reinforced gabion placement, second laminated plate construction, core wall and wave wall construction, stability monitoring and the like. The method has the advantage that the reinforced gabions have good adaptability to deformation or bending. When ground subsidence or foundation deformation happens accidentally and a building foundation is subjected to inherent foundation subsidence, a staggered tensioning and extruding shape is formed in the gabion, and the gabion has the beneficial effects that the gabion can adapt to external deformation and cannot be broken, and the integrity and the stability are high.
本发明涉及围堰施工领域,特别涉及一种复杂地形条件下围堰施工方法。包括钢筋石笼加工、抛石挤淤找平及底板施工、放置第一层钢筋石笼、第一层压板施工、放置第二层钢筋石笼、第二层压板施工、芯墙、防浪墙施工、稳定性监测等步骤,本发明具有钢筋石笼对变形或弯曲具有良好的适应性。当偶然发生地面沉降或地基变形以及建筑物地基发生固有的地基沉降时,在石笼内部形成一种交错拉紧和挤压之状,能适应外部变形不致断裂,整体性及稳定性较高等有益效果。
Cofferdam construction method under complex terrain condition
The invention relates to the field of cofferdam construction, in particular to a cofferdam construction method under complex terrain conditions. Comprising the steps of reinforced gabion machining, riprapping, silt squeezing and leveling, bottom plate construction, first-layer reinforced gabion placement, first laminated plate construction, second-layer reinforced gabion placement, second laminated plate construction, core wall and wave wall construction, stability monitoring and the like. The method has the advantage that the reinforced gabions have good adaptability to deformation or bending. When ground subsidence or foundation deformation happens accidentally and a building foundation is subjected to inherent foundation subsidence, a staggered tensioning and extruding shape is formed in the gabion, and the gabion has the beneficial effects that the gabion can adapt to external deformation and cannot be broken, and the integrity and the stability are high.
本发明涉及围堰施工领域,特别涉及一种复杂地形条件下围堰施工方法。包括钢筋石笼加工、抛石挤淤找平及底板施工、放置第一层钢筋石笼、第一层压板施工、放置第二层钢筋石笼、第二层压板施工、芯墙、防浪墙施工、稳定性监测等步骤,本发明具有钢筋石笼对变形或弯曲具有良好的适应性。当偶然发生地面沉降或地基变形以及建筑物地基发生固有的地基沉降时,在石笼内部形成一种交错拉紧和挤压之状,能适应外部变形不致断裂,整体性及稳定性较高等有益效果。
Cofferdam construction method under complex terrain condition
一种复杂地形条件下围堰施工方法
TIAN ZHUOLUN (Autor:in) / PENG JIE (Autor:in) / ZHAN SHURUI (Autor:in) / ZHANG JINYU (Autor:in) / XUE XINGWANG (Autor:in) / WAN QIAOYE (Autor:in) / BIE XIAOSONG (Autor:in) / QIN PENGJU (Autor:in)
31.12.2021
Patent
Elektronische Ressource
Chinesisch
Steel sheet pile cofferdam construction method under complex marine environment condition
Europäisches Patentamt | 2023
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|Combined cofferdam and construction method of combined cofferdam
Europäisches Patentamt | 2023
|