Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined high-pier bridge construction equipment and method thereof
The invention relates to the field of high-pier bridge construction, in particular to combined high-pier bridge construction equipment and a method thereof. The combined high-pier bridge construction equipment comprises a pouring device, the pouring device comprises an equipment body and a hopper installed on the equipment body, and a blocking plate is installed at the bottom of the hopper in a sliding mode; a driving part for driving the blocking plate to move is mounted on the hopper; the driving part comprises a mounting box fixedly connected to the hopper, a motor is mounted on the inner wall of the mounting box, and a connecting part is mounted on an output shaft of the motor; a first reciprocating screw is rotationally mounted on the inner wall of the mounting box, and the motor is connected with the first reciprocating screw through a connecting part. The combined high-pier bridge construction method comprises the following steps: pile foundation construction; pouring a construction platform on the pile foundation by using a pouring device; pouring the pier on the construction platform through a pouring device; and pouring the cap stone on the pier through the pouring device. The problem of higher risk of harm to workers is solved.
本申请涉及高墩桥梁施工的领域,涉及一种组合式高墩桥梁施工设备及其方法,一种组合式高墩桥梁施工设备,其包括浇筑装置,浇筑装置包括设备本体以及安装在设备本体上的料斗,料斗的底部滑移安装有封堵板,料斗上安装有用于驱动封堵板移动的驱动部件;驱动部件包括固定连接在料斗上的安装盒,安装盒的内壁上安装有电机,电机的输出轴上安装有连接部件;安装盒的内壁上转动安装有第一往复螺杆,电机通过连接部件与第一往复螺杆连接。一种组合式高墩桥梁施工方法,包括以下步骤:桩基施工;使用浇筑装置在桩基上浇筑施工平台;使用浇筑装置在施工平台上浇筑桥墩;使用浇筑装置在桥墩上方浇筑帽石。本申请改善了工作人员受到伤害风险较高的问题。
Combined high-pier bridge construction equipment and method thereof
The invention relates to the field of high-pier bridge construction, in particular to combined high-pier bridge construction equipment and a method thereof. The combined high-pier bridge construction equipment comprises a pouring device, the pouring device comprises an equipment body and a hopper installed on the equipment body, and a blocking plate is installed at the bottom of the hopper in a sliding mode; a driving part for driving the blocking plate to move is mounted on the hopper; the driving part comprises a mounting box fixedly connected to the hopper, a motor is mounted on the inner wall of the mounting box, and a connecting part is mounted on an output shaft of the motor; a first reciprocating screw is rotationally mounted on the inner wall of the mounting box, and the motor is connected with the first reciprocating screw through a connecting part. The combined high-pier bridge construction method comprises the following steps: pile foundation construction; pouring a construction platform on the pile foundation by using a pouring device; pouring the pier on the construction platform through a pouring device; and pouring the cap stone on the pier through the pouring device. The problem of higher risk of harm to workers is solved.
本申请涉及高墩桥梁施工的领域,涉及一种组合式高墩桥梁施工设备及其方法,一种组合式高墩桥梁施工设备,其包括浇筑装置,浇筑装置包括设备本体以及安装在设备本体上的料斗,料斗的底部滑移安装有封堵板,料斗上安装有用于驱动封堵板移动的驱动部件;驱动部件包括固定连接在料斗上的安装盒,安装盒的内壁上安装有电机,电机的输出轴上安装有连接部件;安装盒的内壁上转动安装有第一往复螺杆,电机通过连接部件与第一往复螺杆连接。一种组合式高墩桥梁施工方法,包括以下步骤:桩基施工;使用浇筑装置在桩基上浇筑施工平台;使用浇筑装置在施工平台上浇筑桥墩;使用浇筑装置在桥墩上方浇筑帽石。本申请改善了工作人员受到伤害风险较高的问题。
Combined high-pier bridge construction equipment and method thereof
一种组合式高墩桥梁施工设备及其方法
YU LINYONG (Autor:in) / WANG YANG (Autor:in) / XU YONGHUI (Autor:in) / LIU JIE (Autor:in) / QIU HUI (Autor:in) / TAO FANGFANG (Autor:in)
07.01.2022
Patent
Elektronische Ressource
Chinesisch
Bridge high pier construction equipment and construction method thereof
Europäisches Patentamt | 2022
|Fully-prefabricated pier and bridge combined construction equipment and construction method
Europäisches Patentamt | 2021
|