Bridge high pier construction equipment and construction method thereof
According to the bridge high pier building equipment and the construction method thereof, vertical transportation, a construction platform, concrete pumping and pouring and the like are integrated, the whole-process construction of a bridge high pier is completed in a one-stop auxiliary mode, a foundation is prevented from being additionally made, a tower crane is prevented from being leased and installed, the cost is saved, the construction period is shortened, turnover is improved through standardized turnover, and the cost input is saved; the device is convenient to assemble and disassemble, high in operability, capable of flexibly adapting to actual working condition changes and capable of effectively helping engineering speed increase and efficiency increase. The problems that according to a traditional construction method of the high bridge pier, a large tower crane is matched for construction, the construction period is long, and the engineering cost is high are solved.
本发明公开了一种桥梁高墩建造设备及其施工方法,该设备集成垂直运输、施工平台、混凝土泵送浇筑等于一体,一站式辅助完成桥梁高墩的全流程施工,避免另做基础租赁安装塔吊,节约成本和工期,标准化翻模提高周转节约成本投入,装拆便捷,可操作性强,能灵活适应于实际工况变化,有效帮助工程提速增效。本发明解决了传统的桥梁高墩的建造方法存在大型塔吊配合施工,施工工期长且工程成本高的问题。
Bridge high pier construction equipment and construction method thereof
According to the bridge high pier building equipment and the construction method thereof, vertical transportation, a construction platform, concrete pumping and pouring and the like are integrated, the whole-process construction of a bridge high pier is completed in a one-stop auxiliary mode, a foundation is prevented from being additionally made, a tower crane is prevented from being leased and installed, the cost is saved, the construction period is shortened, turnover is improved through standardized turnover, and the cost input is saved; the device is convenient to assemble and disassemble, high in operability, capable of flexibly adapting to actual working condition changes and capable of effectively helping engineering speed increase and efficiency increase. The problems that according to a traditional construction method of the high bridge pier, a large tower crane is matched for construction, the construction period is long, and the engineering cost is high are solved.
本发明公开了一种桥梁高墩建造设备及其施工方法,该设备集成垂直运输、施工平台、混凝土泵送浇筑等于一体,一站式辅助完成桥梁高墩的全流程施工,避免另做基础租赁安装塔吊,节约成本和工期,标准化翻模提高周转节约成本投入,装拆便捷,可操作性强,能灵活适应于实际工况变化,有效帮助工程提速增效。本发明解决了传统的桥梁高墩的建造方法存在大型塔吊配合施工,施工工期长且工程成本高的问题。
Bridge high pier construction equipment and construction method thereof
桥梁高墩建造设备及其施工方法
OU YAZHOU (Autor:in) / YIN GUANGHUA (Autor:in) / MA MINGLEI (Autor:in)
12.04.2022
Patent
Elektronische Ressource
Chinesisch
Combined high-pier bridge construction equipment and method thereof
Europäisches Patentamt | 2022
|Bridge pier construction equipment and construction method
Europäisches Patentamt | 2023
|