Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for perforating and pipe penetrating of basement concrete wall
The invention discloses a construction method for perforating and pipe penetrating of basement concrete wall. A pipeline penetrating hole is formed in a concrete wall body, a screw rod mounting hole is formed in the inner wall face of the concrete wall body around the pipeline penetrating hole, a mounting screw rod is arranged, a mounting bottom plate is obtained, a pipeline mounting hole is formed in the mounting bottom plate, a mounting bottom plate is bonded to the inner wall face of the concrete wall body, the mounting screw rod penetrates through the mounting bottom plate, an inner ring groove and an outer ring groove are formed in positions, located on the inner side of the mounting bottom plate and located on the inner side and the outer side of the mounting screw rod, of the inner side of the mounting bottom plate respectively, grouting pipes capable of conducting grouting towards the inner ring groove and the outer ring groove respectively are further fixedly arranged on the outer side face of the mounting bottom plate, a perforated pipeline is obtained, the perforated pipeline penetrates through the pipeline penetrating hole, an inner ring waterproof sealing ring and an outer ring waterproof sealing ring which share the same center line are pre-fixedly arranged on the outer side of the mounting bottom plate, a mounting gland is obtained and arranged on the perforated pipeline in a sleeving mode, the mounting screw rod penetrates through the mounting gland and presses the inner ring waterproof sealing ring and the outer ring waterproof sealing ring on the mounting bottom plate through mounting nuts, and the inner ring groove and the outer ring groove are grouted through the grouting pipes.
本发明公开了一种地下室混凝土墙开孔穿管的施工方法,在混凝土墙体上设置管道穿孔,并在混凝土墙体的内墙面上绕管道穿孔设置螺杆安装孔且置于安装螺杆,获取安装底板,安装底板上设置管道安装孔,将安装底板粘接在混凝土墙体的内墙面上,安装螺杆穿过安装底板,安装底板内侧位于安装螺杆内外两侧分别设置有内环槽和外环槽,安装底板外侧面还固定有分别能够朝向内、外环槽内注浆的注浆管,获取穿孔管道,穿孔管道穿过管道穿孔,安装底板的外侧预固定有同中心线的内环、外环防水密封圈,获取安装压盖,安装压盖套设在穿孔管道上,安装螺杆穿过安装压盖且通过安装螺母将内、外环防水密封圈压在安装底板上,通过注浆管朝向内环槽和外环槽内注浆。
Construction method for perforating and pipe penetrating of basement concrete wall
The invention discloses a construction method for perforating and pipe penetrating of basement concrete wall. A pipeline penetrating hole is formed in a concrete wall body, a screw rod mounting hole is formed in the inner wall face of the concrete wall body around the pipeline penetrating hole, a mounting screw rod is arranged, a mounting bottom plate is obtained, a pipeline mounting hole is formed in the mounting bottom plate, a mounting bottom plate is bonded to the inner wall face of the concrete wall body, the mounting screw rod penetrates through the mounting bottom plate, an inner ring groove and an outer ring groove are formed in positions, located on the inner side of the mounting bottom plate and located on the inner side and the outer side of the mounting screw rod, of the inner side of the mounting bottom plate respectively, grouting pipes capable of conducting grouting towards the inner ring groove and the outer ring groove respectively are further fixedly arranged on the outer side face of the mounting bottom plate, a perforated pipeline is obtained, the perforated pipeline penetrates through the pipeline penetrating hole, an inner ring waterproof sealing ring and an outer ring waterproof sealing ring which share the same center line are pre-fixedly arranged on the outer side of the mounting bottom plate, a mounting gland is obtained and arranged on the perforated pipeline in a sleeving mode, the mounting screw rod penetrates through the mounting gland and presses the inner ring waterproof sealing ring and the outer ring waterproof sealing ring on the mounting bottom plate through mounting nuts, and the inner ring groove and the outer ring groove are grouted through the grouting pipes.
本发明公开了一种地下室混凝土墙开孔穿管的施工方法,在混凝土墙体上设置管道穿孔,并在混凝土墙体的内墙面上绕管道穿孔设置螺杆安装孔且置于安装螺杆,获取安装底板,安装底板上设置管道安装孔,将安装底板粘接在混凝土墙体的内墙面上,安装螺杆穿过安装底板,安装底板内侧位于安装螺杆内外两侧分别设置有内环槽和外环槽,安装底板外侧面还固定有分别能够朝向内、外环槽内注浆的注浆管,获取穿孔管道,穿孔管道穿过管道穿孔,安装底板的外侧预固定有同中心线的内环、外环防水密封圈,获取安装压盖,安装压盖套设在穿孔管道上,安装螺杆穿过安装压盖且通过安装螺母将内、外环防水密封圈压在安装底板上,通过注浆管朝向内环槽和外环槽内注浆。
Construction method for perforating and pipe penetrating of basement concrete wall
地下室混凝土墙开孔穿管的施工方法
ZHOU HAIFENG (Autor:in)
07.01.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Construction method for existing building basement frame column externally penetrating shear wall
Europäisches Patentamt | 2023
|Basement through-wall pipe waterproof structure and construction method
Europäisches Patentamt | 2023
|Reinforced concrete basement outer wall construction device
Europäisches Patentamt | 2024
|