Construction method for installing bolts in platform beam plate
The invention relates to the field of metallurgical construction, in particular to a construction method for installing bolts in a platform beam plate. The construction method comprises the following steps that the positions of the bolts are marked on a formwork at the bottom of the platform beam plate, and a lower-layer reinforcing mesh is paved on the formwork at the bottom of the platform beam plate; bottom steel bars are bound; bolt fixing supports are installed, the lower ends of the bolt fixing supports are welded to the lower-layer reinforcing mesh, and the adjacent bolt fixing supports are connected through first connecting rods; the lower portion of the bolt is welded and fixed to the bolt fixing frame through a second connecting rod; an upper-layer reinforcing mesh of the platform beam plate is bound; after the bolts, embedded parts and the like are installed, a platform beam plate side formwork is closed and reinforced; and the bolt is retest, and whether the bolt fixing support is firm and stable or not and whether the bolt fixing support is separated from the upper-layer reinforcing mesh or not are checked. The influence of the upper-layer reinforcing mesh on bolt installation is eliminated, the bolt is used as a positioning center for reinforcing steel bar binding, and the installation precision of the bolt is guaranteed.
本发明涉及冶金建设领域,尤其是一种平台梁板内螺栓安装施工方法,在平台梁板底部的模板上标识螺栓位置,并在平台梁板底部的模板上铺设下层钢筋网片;绑扎底部钢筋;安装螺栓固定支架,螺栓固定支架的下端与下层钢筋网片焊接,相邻螺栓固定支架之间通过连接杆一连接;螺栓下部通过连接杆二与螺栓固定架焊接固定;绑扎平台梁板的上层钢筋网片;当螺栓、埋件等安装完毕后,进行平台梁板侧模的封闭加固;对螺栓进行复测,检查螺栓固定支架是否牢固稳定,螺栓固定支架与上层钢筋网片是否脱开。本发明消除上层钢筋网片对螺栓安装的影响,钢筋绑扎以螺栓为定位中心,保证螺栓的安装精度。
Construction method for installing bolts in platform beam plate
The invention relates to the field of metallurgical construction, in particular to a construction method for installing bolts in a platform beam plate. The construction method comprises the following steps that the positions of the bolts are marked on a formwork at the bottom of the platform beam plate, and a lower-layer reinforcing mesh is paved on the formwork at the bottom of the platform beam plate; bottom steel bars are bound; bolt fixing supports are installed, the lower ends of the bolt fixing supports are welded to the lower-layer reinforcing mesh, and the adjacent bolt fixing supports are connected through first connecting rods; the lower portion of the bolt is welded and fixed to the bolt fixing frame through a second connecting rod; an upper-layer reinforcing mesh of the platform beam plate is bound; after the bolts, embedded parts and the like are installed, a platform beam plate side formwork is closed and reinforced; and the bolt is retest, and whether the bolt fixing support is firm and stable or not and whether the bolt fixing support is separated from the upper-layer reinforcing mesh or not are checked. The influence of the upper-layer reinforcing mesh on bolt installation is eliminated, the bolt is used as a positioning center for reinforcing steel bar binding, and the installation precision of the bolt is guaranteed.
本发明涉及冶金建设领域,尤其是一种平台梁板内螺栓安装施工方法,在平台梁板底部的模板上标识螺栓位置,并在平台梁板底部的模板上铺设下层钢筋网片;绑扎底部钢筋;安装螺栓固定支架,螺栓固定支架的下端与下层钢筋网片焊接,相邻螺栓固定支架之间通过连接杆一连接;螺栓下部通过连接杆二与螺栓固定架焊接固定;绑扎平台梁板的上层钢筋网片;当螺栓、埋件等安装完毕后,进行平台梁板侧模的封闭加固;对螺栓进行复测,检查螺栓固定支架是否牢固稳定,螺栓固定支架与上层钢筋网片是否脱开。本发明消除上层钢筋网片对螺栓安装的影响,钢筋绑扎以螺栓为定位中心,保证螺栓的安装精度。
Construction method for installing bolts in platform beam plate
平台梁板内螺栓安装施工方法
WANG DAIFA (Autor:in) / LI ZHANCHUANG (Autor:in) / WANG JUNYONG (Autor:in)
07.01.2022
Patent
Elektronische Ressource
Chinesisch
Construction method for installing and fixing foundation bolts
Europäisches Patentamt | 2023
|Installing bolts, catches and locks
British Library Online Contents | 2000
Installing rolling-mill anchor bolts
Engineering Index Backfile | 1915
|