Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Machining process of steel plate shear wall
The invention provides a machining process of a steel plate shear wall, and belongs to the technical field of shear wall machining. The machining process comprises the steps of site preparation, jig frame installation, plate blanking, wall surface treatment, box body treatment, shear wall assembly, assembly inspection, welding assembly, quality acceptance and jig frame disassembly. Threaded holes are formed in a wall surface, then a process partition plate is installed through screws, so that the wall surface is reinforced, the welding stability of the wall surface is guaranteed, supporting rods are installed on a box body and used for reinforcing the box body, the wall surface and the box body are assembled on a jig frame, and a temporary support is additionally arranged in the assembling process. According to the machining process of the steel plate shear wall, the process partition plate, a supporting rod and the temporary support are arranged and matched with one another, so that the purpose of ensuring the stability during subsequent shear wall welding is achieved, it is ensured that no gap is reserved during shear wall assembling, welding work can be conducted, a complete steel plate shear wall is formed, and finally the quality of the steel plate shear wall is checked and accepted; and the quality of the steel plate shear wall can be fully ensured.
本发明提供了一种钢板剪力墙的加工工艺,属于剪力墙加工技术领域。包括场地准备、胎架安装、板材下料、墙面处理、箱体处理、剪力墙组装、组装检验、焊接组装、质量验收、胎架拆卸。通过在墙面上开设螺纹孔,之后通过螺杆安装工艺隔板,以便对墙面进行加固,保证其进行焊接时的稳定性,箱体上则安装有支撑杆,支撑杆用于对箱体进行加固,在胎架上将墙面与箱体进行组装,组装时加设临时支撑,通过设置工艺隔板、支撑杆、临时支撑,三者相互配合,以便达到确保后续剪力墙焊接时稳定性的目的,确保剪力墙组装时不会留有缝隙,即可进行焊接工作,以便形成完整的钢板剪力墙,最后对钢板剪力墙的质量进行验收,即可充分确保钢板剪力墙的质量。
Machining process of steel plate shear wall
The invention provides a machining process of a steel plate shear wall, and belongs to the technical field of shear wall machining. The machining process comprises the steps of site preparation, jig frame installation, plate blanking, wall surface treatment, box body treatment, shear wall assembly, assembly inspection, welding assembly, quality acceptance and jig frame disassembly. Threaded holes are formed in a wall surface, then a process partition plate is installed through screws, so that the wall surface is reinforced, the welding stability of the wall surface is guaranteed, supporting rods are installed on a box body and used for reinforcing the box body, the wall surface and the box body are assembled on a jig frame, and a temporary support is additionally arranged in the assembling process. According to the machining process of the steel plate shear wall, the process partition plate, a supporting rod and the temporary support are arranged and matched with one another, so that the purpose of ensuring the stability during subsequent shear wall welding is achieved, it is ensured that no gap is reserved during shear wall assembling, welding work can be conducted, a complete steel plate shear wall is formed, and finally the quality of the steel plate shear wall is checked and accepted; and the quality of the steel plate shear wall can be fully ensured.
本发明提供了一种钢板剪力墙的加工工艺,属于剪力墙加工技术领域。包括场地准备、胎架安装、板材下料、墙面处理、箱体处理、剪力墙组装、组装检验、焊接组装、质量验收、胎架拆卸。通过在墙面上开设螺纹孔,之后通过螺杆安装工艺隔板,以便对墙面进行加固,保证其进行焊接时的稳定性,箱体上则安装有支撑杆,支撑杆用于对箱体进行加固,在胎架上将墙面与箱体进行组装,组装时加设临时支撑,通过设置工艺隔板、支撑杆、临时支撑,三者相互配合,以便达到确保后续剪力墙焊接时稳定性的目的,确保剪力墙组装时不会留有缝隙,即可进行焊接工作,以便形成完整的钢板剪力墙,最后对钢板剪力墙的质量进行验收,即可充分确保钢板剪力墙的质量。
Machining process of steel plate shear wall
一种钢板剪力墙的加工工艺
YU HAIYANG (Autor:in) / WANG WEI (Autor:in) / LI JIANLI (Autor:in) / YAN YONGXIAN (Autor:in) / YU HAITAO (Autor:in)
11.01.2022
Patent
Elektronische Ressource
Chinesisch
Novel heat preservation integrated steel plate superposed shear wall and machining process thereof
Europäisches Patentamt | 2020
|Steel plate shear wall unit and modular combined steel plate shear wall
Europäisches Patentamt | 2024
|