High-altitude cantilever structure curtain wall installation construction method
The invention discloses a high-altitude cantilever structure curtain wall installation construction method. The high-altitude cantilever structure curtain wall installation construction method comprises the following steps that S1, various embedded facilities are arranged during building main body floor concrete construction; S2, curtain walls below two layers of the bottom of the cantilever structure are constructed; S3, a cantilever structure curtain wall is constructed; S4, a floor curtain wall above the cantilever structure is constructed; S5, two layers of curtain walls at the bottom of the cantilever structure are constructed; and S6, the cantilever structure floor slab and a reserved through hole are blocked. According to the high-altitude cantilever structure curtain wall installation construction method, the construction problem of curtain walls of parts of floors at the bottom of a high-altitude cantilever structure and below the high-altitude cantilever structure can be effectively solved, meanwhile, it is guaranteed that construction of operators is safe, economical, reasonable, rapid and efficient, and the high-altitude cantilever structure curtain wall installation construction method has high practicability and good application prospects.
本发明公开了本发明一种高空悬挑结构幕墙安装施工方法,所述方法包括如下步骤:S1、建筑主体楼面混凝土施工时各类预埋设施的设置;S2、悬挑结构底部两层以下幕墙施工;S3、悬挑结构幕墙施工;S4、悬挑结构以上楼层幕墙施工;S5、悬挑结构底部两层幕墙施工;S6、悬挑结构楼板及预留穿孔封堵。本发明所提供的高空悬挑结构幕墙安装施工方法,可有效解决高空悬挑结构底部及其以下的部分楼层幕墙施工难题,同时保障作业人员施工安全,经济合理、快速高效,具有较强的实用性和较好的应用前景。
High-altitude cantilever structure curtain wall installation construction method
The invention discloses a high-altitude cantilever structure curtain wall installation construction method. The high-altitude cantilever structure curtain wall installation construction method comprises the following steps that S1, various embedded facilities are arranged during building main body floor concrete construction; S2, curtain walls below two layers of the bottom of the cantilever structure are constructed; S3, a cantilever structure curtain wall is constructed; S4, a floor curtain wall above the cantilever structure is constructed; S5, two layers of curtain walls at the bottom of the cantilever structure are constructed; and S6, the cantilever structure floor slab and a reserved through hole are blocked. According to the high-altitude cantilever structure curtain wall installation construction method, the construction problem of curtain walls of parts of floors at the bottom of a high-altitude cantilever structure and below the high-altitude cantilever structure can be effectively solved, meanwhile, it is guaranteed that construction of operators is safe, economical, reasonable, rapid and efficient, and the high-altitude cantilever structure curtain wall installation construction method has high practicability and good application prospects.
本发明公开了本发明一种高空悬挑结构幕墙安装施工方法,所述方法包括如下步骤:S1、建筑主体楼面混凝土施工时各类预埋设施的设置;S2、悬挑结构底部两层以下幕墙施工;S3、悬挑结构幕墙施工;S4、悬挑结构以上楼层幕墙施工;S5、悬挑结构底部两层幕墙施工;S6、悬挑结构楼板及预留穿孔封堵。本发明所提供的高空悬挑结构幕墙安装施工方法,可有效解决高空悬挑结构底部及其以下的部分楼层幕墙施工难题,同时保障作业人员施工安全,经济合理、快速高效,具有较强的实用性和较好的应用前景。
High-altitude cantilever structure curtain wall installation construction method
一种高空悬挑结构幕墙安装施工方法
QIAO XIAOMING (Autor:in) / DING SHOUMING (Autor:in) / KONG FANFENG (Autor:in) / XU XIAOQIN (Autor:in)
14.01.2022
Patent
Elektronische Ressource
Chinesisch
Cantilever scaffold for curtain wall installation and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Installation and construction method for high-altitude large-span steel corridor curtain wall
Europäisches Patentamt | 2021
|CURTAIN WALL UNIT, CURTAIN WALL INSTALLATION STRUCTURE, AND INSTALLATION METHOD OF CURTAIN WALL
Europäisches Patentamt | 2017
|CURTAIN WALL UNIT, CURTAIN WALL INSTALLATION STRUCTURE, AND INSTALLATION METHOD OF CURTAIN WALL
Europäisches Patentamt | 2017
|