Construction method of cofferdam-free prefabricated U-shaped sheet pile revetment
The invention discloses a construction method of a cofferdam-free prefabricated U-shaped sheet pile revetment. The construction method comprises the following steps: (1) preparation work before piling is conducted; (2) a first sheet pile is driven in the initial pile sinking position; (3) a guide frame is erected; (4) a second sheet pile is driven in through the guide frame; (5) the step (4) is repeated, and the subsequent sheet piles are driven one by one till pile sinking is completed; (6) the guide frame and the formwork are dismantled, and a top beam is poured at the upper ends of the plate piles in rows through steel bar delayed coagulation soil; and (7) soil backfilling is conducted. According to the construction method, cofferdams are avoided, the construction period of the sheet pile revetment is shortened, the efficiency is high, the water stopping performance is good, and the quality is good.
一种免围堰预制U型板桩驳岸施工方法,步骤包括:步骤1)打桩前准备工作;步骤2)在沉桩起始位置处,打入第一根板桩;步骤3)支设导架;步骤4)利用导架打入第二根板桩;步骤5)重复步骤4),逐根打入后续各根板桩直至沉桩完毕;步骤6)拆除导架,支模,将成排板桩上端通过钢筋缓凝土浇筑冠梁;步骤7)回填土。本发明的施工方法,避免了围堰,缩短了板桩驳岸施工工期,效率高,止水性能好,质量好。
Construction method of cofferdam-free prefabricated U-shaped sheet pile revetment
The invention discloses a construction method of a cofferdam-free prefabricated U-shaped sheet pile revetment. The construction method comprises the following steps: (1) preparation work before piling is conducted; (2) a first sheet pile is driven in the initial pile sinking position; (3) a guide frame is erected; (4) a second sheet pile is driven in through the guide frame; (5) the step (4) is repeated, and the subsequent sheet piles are driven one by one till pile sinking is completed; (6) the guide frame and the formwork are dismantled, and a top beam is poured at the upper ends of the plate piles in rows through steel bar delayed coagulation soil; and (7) soil backfilling is conducted. According to the construction method, cofferdams are avoided, the construction period of the sheet pile revetment is shortened, the efficiency is high, the water stopping performance is good, and the quality is good.
一种免围堰预制U型板桩驳岸施工方法,步骤包括:步骤1)打桩前准备工作;步骤2)在沉桩起始位置处,打入第一根板桩;步骤3)支设导架;步骤4)利用导架打入第二根板桩;步骤5)重复步骤4),逐根打入后续各根板桩直至沉桩完毕;步骤6)拆除导架,支模,将成排板桩上端通过钢筋缓凝土浇筑冠梁;步骤7)回填土。本发明的施工方法,避免了围堰,缩短了板桩驳岸施工工期,效率高,止水性能好,质量好。
Construction method of cofferdam-free prefabricated U-shaped sheet pile revetment
免围堰预制U型板桩驳岸施工方法
SONG QIANJUN (Autor:in) / MO LUSHENG (Autor:in) / ZHOU NANA (Autor:in) / ZHENG PENG (Autor:in) / YANG WENTAO (Autor:in)
21.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cofferdam-free prefabricated U-shaped sheet pile revetment construction guide frame
Europäisches Patentamt | 2022
|Prefabricated wave pile ecological revetment construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|