The invention discloses a pile pulling device capable of correcting the pile pulling direction in real time and a pile pulling method thereof in the technical field of pile pulling construction.The pile pulling device comprises drill bases, supporting frames, a mounting plate, a protection frame, a control panel and a pile body, wherein the three drill bases are mounted on the three surfaces of the outer side of the pile body, the supporting frames are mounted on the two non-adjacent drill bases in the three drill bases, the mounting plate is mounted at the tops of the two supporting frames, and a pile pulling mechanism for fixing and pulling up the pile body is mounted on the mounting plate. According to the device, the inclination deviation of the pile body in any direction can be fed back in real time, a reverse force is rapidly applied to the inclination deviation of the pile body in any direction, so that the deviation of the pile body is pulled back and corrected, and furthermore, the pile body is perpendicular to the ground all the time, so that a friction force between the pile body and soil is reduced; and the height of the correcting mechanism can be changed along with the pull-out length of the pile body, the correcting mechanism acts on the lever principle when applying force to the pile body, and the correcting mechanism is more stable and effective.
本发明公开了拔桩施工技术领域的一种具有实时矫正拔桩方向的拔桩装置及其拔桩方法,包括基台、支撑架、安装板、保护架、控制面板和桩体,所述桩体的外侧三面安装有三组基台,三组所述基台中不相邻的两组基台上均安装有支撑架,两组支撑架的顶端安装有安装板,安装板上安装有用于固定和拔起桩体的拔桩机构,本装置可以实时对桩体的任意方向倾斜偏移发生反馈,并快速对桩体任意方向的倾斜偏移进行反向施力,使得桩体的偏移被拨回矫正,进一步使得桩体始终垂直于地面,减小与泥土间的摩擦力,并且矫正机构的高度可以随着桩体的拔出长度进行改变,使得矫正机构对桩体施力时作用于杠杆原理,更加稳定有效。
The invention discloses a pile pulling device capable of correcting the pile pulling direction in real time and a pile pulling method thereof in the technical field of pile pulling construction.The pile pulling device comprises drill bases, supporting frames, a mounting plate, a protection frame, a control panel and a pile body, wherein the three drill bases are mounted on the three surfaces of the outer side of the pile body, the supporting frames are mounted on the two non-adjacent drill bases in the three drill bases, the mounting plate is mounted at the tops of the two supporting frames, and a pile pulling mechanism for fixing and pulling up the pile body is mounted on the mounting plate. According to the device, the inclination deviation of the pile body in any direction can be fed back in real time, a reverse force is rapidly applied to the inclination deviation of the pile body in any direction, so that the deviation of the pile body is pulled back and corrected, and furthermore, the pile body is perpendicular to the ground all the time, so that a friction force between the pile body and soil is reduced; and the height of the correcting mechanism can be changed along with the pull-out length of the pile body, the correcting mechanism acts on the lever principle when applying force to the pile body, and the correcting mechanism is more stable and effective.
本发明公开了拔桩施工技术领域的一种具有实时矫正拔桩方向的拔桩装置及其拔桩方法,包括基台、支撑架、安装板、保护架、控制面板和桩体,所述桩体的外侧三面安装有三组基台,三组所述基台中不相邻的两组基台上均安装有支撑架,两组支撑架的顶端安装有安装板,安装板上安装有用于固定和拔起桩体的拔桩机构,本装置可以实时对桩体的任意方向倾斜偏移发生反馈,并快速对桩体任意方向的倾斜偏移进行反向施力,使得桩体的偏移被拨回矫正,进一步使得桩体始终垂直于地面,减小与泥土间的摩擦力,并且矫正机构的高度可以随着桩体的拔出长度进行改变,使得矫正机构对桩体施力时作用于杠杆原理,更加稳定有效。
Pile pulling device capable of correcting pile pulling direction in real time and pile pulling method thereof
一种具有实时矫正拔桩方向的拔桩装置及其拔桩方法
SHI KUANG (Autor:in)
21.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
OPERATION PLATFORM FOR PULLING PILES, PILE PULLING DEVICE AND PILE PULLING METHOD
Europäisches Patentamt | 2022
|Tubular pile pulling machine and tubular pile pulling method thereof
Europäisches Patentamt | 2023
|