The invention discloses a frame-core tube construction method. The method comprises the steps that step a, outer frame steel pipe columns of a frame are installed; step b, a temporary support is arranged on the side, close to the core tube, of the frame, and then floor steel beams are installed; step c, the step a to the step b are repeated, and the frame is sequentially provided with a steel structure mounting area, a steel bar mounting area and a concrete area from top to bottom; step d, in the steel bar mounting area, steel structure bearing plates are laid on the floor steel beams; step e, shear wall steel bars of the core tube are bound; step f, steel beam embedded parts of the core tube are inserted and pre-buried; step g, a shear wall formwork of the core tube is installed, and a beam formwork, a plate formwork and a stair formwork of the core tube are installed; step h, steel bars of the outer frame floor slab are bound, and meanwhile steel bars of beams, plates and stairs of the core tube are bound; step i, concrete pouring is carried out on the outer frame horizontal structure and shear walls, beams, plates and stairs of the core tube; and step j, the steps a to b are repeated, the step d is repeated, and the steps e to i are repeated.
本发明公开了一种框架‑核心筒施工方法,包括步骤a、框架的外框钢管柱安装;步骤b、在框架靠近核心筒一侧设置临时支撑,随后安装楼层钢梁;步骤c、重复步骤a至步骤b,框架自上而下依次设有钢结构安装区、钢筋安装区和混凝土区;步骤d、在钢筋安装区,在楼层钢梁上铺设钢结构承板;步骤e、绑扎核心筒的剪力墙钢筋;步骤f、核心筒的钢梁埋件穿插预埋;步骤g、安装核心筒的剪力墙模板,安装核心筒的梁、板、楼梯模板;步骤h、进行外框楼板的钢筋绑扎,同时进行核心筒的梁、板和楼梯的钢筋绑扎;步骤i、对外框水平结构和核心筒的剪力墙、梁、板和楼梯进行混凝土浇筑;步骤j、重复上述步骤a至步骤b,重复步骤d,重复步骤e至步骤i。
Frame-core tube construction method
The invention discloses a frame-core tube construction method. The method comprises the steps that step a, outer frame steel pipe columns of a frame are installed; step b, a temporary support is arranged on the side, close to the core tube, of the frame, and then floor steel beams are installed; step c, the step a to the step b are repeated, and the frame is sequentially provided with a steel structure mounting area, a steel bar mounting area and a concrete area from top to bottom; step d, in the steel bar mounting area, steel structure bearing plates are laid on the floor steel beams; step e, shear wall steel bars of the core tube are bound; step f, steel beam embedded parts of the core tube are inserted and pre-buried; step g, a shear wall formwork of the core tube is installed, and a beam formwork, a plate formwork and a stair formwork of the core tube are installed; step h, steel bars of the outer frame floor slab are bound, and meanwhile steel bars of beams, plates and stairs of the core tube are bound; step i, concrete pouring is carried out on the outer frame horizontal structure and shear walls, beams, plates and stairs of the core tube; and step j, the steps a to b are repeated, the step d is repeated, and the steps e to i are repeated.
本发明公开了一种框架‑核心筒施工方法,包括步骤a、框架的外框钢管柱安装;步骤b、在框架靠近核心筒一侧设置临时支撑,随后安装楼层钢梁;步骤c、重复步骤a至步骤b,框架自上而下依次设有钢结构安装区、钢筋安装区和混凝土区;步骤d、在钢筋安装区,在楼层钢梁上铺设钢结构承板;步骤e、绑扎核心筒的剪力墙钢筋;步骤f、核心筒的钢梁埋件穿插预埋;步骤g、安装核心筒的剪力墙模板,安装核心筒的梁、板、楼梯模板;步骤h、进行外框楼板的钢筋绑扎,同时进行核心筒的梁、板和楼梯的钢筋绑扎;步骤i、对外框水平结构和核心筒的剪力墙、梁、板和楼梯进行混凝土浇筑;步骤j、重复上述步骤a至步骤b,重复步骤d,重复步骤e至步骤i。
Frame-core tube construction method
一种框架-核心筒施工方法
LI NINGNING (Autor:in) / GONG KEJUN (Autor:in) / HE LUQING (Autor:in) / ZHOU YANPENG (Autor:in) / SONG KAIFENG (Autor:in) / JIA KAI (Autor:in) / YANG NAN (Autor:in) / ZHANG CHAO (Autor:in)
28.01.2022
Patent
Elektronische Ressource
Chinesisch
Construction method of frame-core tube building structure
Europäisches Patentamt | 2024
|Braced frame-core tube building structure and construction method thereof
Europäisches Patentamt | 2021
|Frame core tube rigid connection floor beam structure system and construction method
Europäisches Patentamt | 2022
|