Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reinforcing structure and reinforcing method for partially cutting off connecting beam damaged by earthquake
The invention discloses a reinforcing structure and a reinforcing method for partially cutting off connecting beam damaged by earthquake. The reinforcing structure comprises a frame main body, a transmission assembly and a fastening assembly. The method comprises the following steps of step 1, seismic damage coupling beam partial resection, step 2, coupling beam residual section reinforcement, and step 3, damper installation. By reinforcing the residual section of the coupling beam into the coupling beam with good energy dissipation performance, a problem of repairing the damaged coupling beam caused by an earthquake and the like can be well solved, and when the earthquake comes again, only the damper needs to be replaced without reinforcement, so time and labor are saved.
本发明公开了一种震损连梁部分切除的加固结构及加固方法,所述加固结构包括:框架主体、传动组件以及紧固组件,所述方法包括以下步骤:步骤一:震损连梁部分切除,步骤二:连梁残余段加固,步骤三:阻尼器加装。本发明通过对连梁残余段加固成耗能性能好的连梁,能够很好的解决由于地震等造成连梁损坏的修复问题,并且当再次地震来临时,无需加固只需更换阻尼器即可,省时省力。
Reinforcing structure and reinforcing method for partially cutting off connecting beam damaged by earthquake
The invention discloses a reinforcing structure and a reinforcing method for partially cutting off connecting beam damaged by earthquake. The reinforcing structure comprises a frame main body, a transmission assembly and a fastening assembly. The method comprises the following steps of step 1, seismic damage coupling beam partial resection, step 2, coupling beam residual section reinforcement, and step 3, damper installation. By reinforcing the residual section of the coupling beam into the coupling beam with good energy dissipation performance, a problem of repairing the damaged coupling beam caused by an earthquake and the like can be well solved, and when the earthquake comes again, only the damper needs to be replaced without reinforcement, so time and labor are saved.
本发明公开了一种震损连梁部分切除的加固结构及加固方法,所述加固结构包括:框架主体、传动组件以及紧固组件,所述方法包括以下步骤:步骤一:震损连梁部分切除,步骤二:连梁残余段加固,步骤三:阻尼器加装。本发明通过对连梁残余段加固成耗能性能好的连梁,能够很好的解决由于地震等造成连梁损坏的修复问题,并且当再次地震来临时,无需加固只需更换阻尼器即可,省时省力。
Reinforcing structure and reinforcing method for partially cutting off connecting beam damaged by earthquake
一种震损连梁部分切除的加固结构及加固方法
WANG TINGYAN (Autor:in) / ZHOU YUN (Autor:in) / DENG XUESONG (Autor:in) / ZHANG CHAO (Autor:in)
08.02.2022
Patent
Elektronische Ressource
Chinesisch
Reinforcing structure for partially cutting off connecting beam damaged by earthquake
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|Reinforcing structure for improving earthquake resistance of earthquake-damaged frame structure
Europäisches Patentamt | 2023
|EARTHQUAKE RESISTANCE REINFORCING STRUCTURE, AND EARTHQUAKE RESISTANCE REINFORCING METHOD
Europäisches Patentamt | 2024
|