Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asphalt pavement composite structure and construction method thereof
The invention relates to an asphalt pavement composite structure and a construction method thereof. The main scheme is that the asphalt pavement composite structure comprises an inclined roadbed, and a subbase layer and an asphalt surface layer are sequentially laid on the upper surface of the inclined roadbed. A plurality of blocking frame bodies and fixing assemblies used for fixing the blocking frame bodies are further laid on the upper surface of the inclined roadbed, the thickness of the blocking frame bodies is smaller than or equal to that of the subbase layer, and the hollow positions of the blocking frame bodies are containing areas used for evenly distributing gravel of the subbase layer. The blocking frame body is arranged, the containing areas of the blocking frame body are used for containing broken stones, so that the broken stones are limited, the situation that the broken stones slide down is effectively reduced, the broken stones are evenly distributed in the multiple containing areas, and the thickness uniformity of the subbase layer can be improved.
本申请涉及一种沥青路面组合结构及其施工方法,其中主要方案为一种沥青路面组合结构,其包括倾斜路基,倾斜路基上表面依次铺设有底基层和沥青面层,所述倾斜路基上表面还铺设有多个阻挡框体和用于对阻挡框体进行固定的固定组件,所述阻挡框体的厚度小于或等于所述底基层的厚度,所述阻挡框体的中空处为用于均匀分摊底基层的碎石的容纳区域。本申请通过设置阻挡框体,利用阻挡框体的容纳区域以容纳碎石,从而对碎石进行限位,以有效减少碎石滑落的情况发生,并且多个容纳区域进行碎石均匀分摊,能够提高底基层的厚度均匀性。
Asphalt pavement composite structure and construction method thereof
The invention relates to an asphalt pavement composite structure and a construction method thereof. The main scheme is that the asphalt pavement composite structure comprises an inclined roadbed, and a subbase layer and an asphalt surface layer are sequentially laid on the upper surface of the inclined roadbed. A plurality of blocking frame bodies and fixing assemblies used for fixing the blocking frame bodies are further laid on the upper surface of the inclined roadbed, the thickness of the blocking frame bodies is smaller than or equal to that of the subbase layer, and the hollow positions of the blocking frame bodies are containing areas used for evenly distributing gravel of the subbase layer. The blocking frame body is arranged, the containing areas of the blocking frame body are used for containing broken stones, so that the broken stones are limited, the situation that the broken stones slide down is effectively reduced, the broken stones are evenly distributed in the multiple containing areas, and the thickness uniformity of the subbase layer can be improved.
本申请涉及一种沥青路面组合结构及其施工方法,其中主要方案为一种沥青路面组合结构,其包括倾斜路基,倾斜路基上表面依次铺设有底基层和沥青面层,所述倾斜路基上表面还铺设有多个阻挡框体和用于对阻挡框体进行固定的固定组件,所述阻挡框体的厚度小于或等于所述底基层的厚度,所述阻挡框体的中空处为用于均匀分摊底基层的碎石的容纳区域。本申请通过设置阻挡框体,利用阻挡框体的容纳区域以容纳碎石,从而对碎石进行限位,以有效减少碎石滑落的情况发生,并且多个容纳区域进行碎石均匀分摊,能够提高底基层的厚度均匀性。
Asphalt pavement composite structure and construction method thereof
一种沥青路面组合结构及其施工方法
XIONG WEIMING (Autor:in) / TANG DICHENG (Autor:in) / LIU SHAOJUN (Autor:in) / MENG YUEMIAO (Autor:in) / ZHAO LIFENG (Autor:in)
11.02.2022
Patent
Elektronische Ressource
Chinesisch
Composite asphalt pavement and construction method thereof
Europäisches Patentamt | 2020
|Asphalt pavement structure and construction method thereof
Europäisches Patentamt | 2021
|Asphalt pavement structure and construction method thereof
Europäisches Patentamt | 2024
|Composite self-healing asphalt concrete pavement structure and construction method thereof
Europäisches Patentamt | 2024
|